background image

Reverse Osmosis & Water Treatment Systems

[email protected]

+1(714) 432-9996

+1 (844) 309-7501

www.pureaqua.com

Get a Quote

Fleck 4650

Service Manual

 

BR40261 Rev C     AP10

TABLE OF CONTENTS

JOB SPECIFICATION SHEET ...............................................1

INSTALLATION AND START-UP PROCEDURE ....................1

CONTROL VALVE DRIVE ASSEMBLY ..................................2

CONTROL DRIVE ASSEMBLY FOR CLOCK ........................3

BYPASS VALVE ASSEMBLY .................................................4

WATER CONDITIONER FLOW DIAGRAMS .........................5

SERVICE INSTRUCTIONS ....................................................7

TROUBLESHOOTING ...........................................................9

SERVICE ASSEMBLY ............................................................10

JOB SPECIFICATION SHEET

Job Number:  _______________________________________

Model Number:  _____________________________________

Water Test:  ________________________________________

Capacity Per Unit: ________ Max. ________ Per Regeneration

Mineral Tank Size Diameter: _____ Height: _______________

Brine Tank Size and Salt Setting per Regeneration: _________

1.  Type of Timer:

A. "L"

B. 7 Day

C. 12 Day

2.  Day/Time of Regeneration: _________________

3.  Drain Line Flow Control: ___________________  gpm

4.  

Brine Refill Rate:

  _________________________  gpm

5.  Injector Size#:  ___________________________

INSTALLATION AND START-UP 
PROCEDURE

The water softener should be installed with the inlet, outlet and 
drain connections made in accordance with manufacturer’s 
recommendations and to meet applicable plumbing codes.

24 GR, Gear

Manual 

Regeneration 

Knob

Skipper Wheel 

(Shows every 

other day 

regeneration)

Red Pointer

Red Time 

Set Button

Time of Day 

Arrow

BR61501-4650 Rev A

Figure 1 

1.  Manually index the softener control into the service position 

and let water flow into the resin tank. When the water flow 

stops, open a softened water tap until all air is released 
from the lines, then close the tap.

Note:   The various regeneration positions may be 

dialed manually by turning the knob on the 
front of the control until the indicator shows 
that the softener is in the desired position.

2.  Manually index the control to the backwash position and 

allow water to flow at the drain for 3 or 4 minutes.

3.  Remove back cover plate.

4.  Make sure that the salt dosage is set as recommended by 

the manufacturer. Manually index the control to the brine fill 

position and allow the brine tank to fill to the top of the air 

check.

5.  Manually index the control to the brine draw position and 

allow the control to draw water from the brine tank until it 
stops.

6.  Plug in the electrical cord and look in the sight hole in the 

back of the motor to see that it is running. Set the days that 
regeneration is to occur by sliding tabs on skipper wheel 

outward to expose trip fingers. Each tab is one day. Finger 

at red pointer is tonight. Moving clockwise from red pointer, 

extend or retract fingers to obtain the desired regeneration 

schedule.

7.  Manually advance the control to the beginning of the brine 

fill position; and allow the control to return to the service 

position automatically.

8.  Fill the brine tank with salt.

9.  Replace back cover on the control.

10. Make sure that any bypass valving is left in the normal 

service position.

Summary of Contents for Fleck 4650

Page 1: ...of Day Arrow BR61501 4650 Rev A Figure 1 1 Manually index the softener control into the service position and let water flow into the resin tank When the water flow stops open a softened water tap unt...

Page 2: ...24 Hour Gear Assembly Silver 13 1 13011 Cycle Actuator Gear 14 1 14177 Knob Manual Regeneration 15 4 13300 Ball 1 4 Dia 16 2 13311 Spring Detent Skipper Wheel 17 1 14207 Knob Label Silver 18 1 14176 V...

Page 3: ...021 560CD HW 22 1 13163 Injector Body 23 1 10225 xx Injector Nozzle Hot Water 1 10913 xx Injector Nozzle Cold Water 24 1 10226 xx Injector Throat Specify Size Hot Water 1 10914 xx Injector Throat Spec...

Page 4: ...Plug Bypass 4 1 11978 Side Cover 5 1 13604 03 Label 6 8 15727 Screw 7 1 11986 Side Cover 8 1 11979 Lever Bypass 9 1 11989 Screw Hex Head 1 4 14 10 1 60040SS Bypass Valve 5600 3 4 NPT Blk Grip Lever SS...

Page 5: ...hole in the piston over the top edge of the piston and out the drain line 3 Backwash Position 10 Minutes Hard water enters the unit at the valve inlet flows around the lower piston groove and lower p...

Page 6: ...k passage around the upper piston groove and out the drain line 7 Settling Rinse Position 5 Minutes Hard water enters the unit at the valve inlet flows around the lower piston groove down thru the top...

Page 7: ...normal service position Water pressure should now be applied to the conditioner and any bypass line shut off 12 Check for leaks at all seal areas Check drain seal with the control in the backwash posi...

Page 8: ...lace timer mounting screws Replace screw and washer at drive yoke 11 Return bypass or inlet valving to normal service position Water pressure should now be applied to the conditioner and any bypass li...

Page 9: ...nt work done on plumbing system Remove piston and clean control Loss of resin through drain line Air in water system Ensure that well system has proper air eliminator control Check for dry well condit...

Page 10: ...Cold Water 60032 001 Brine Valve Hot Water 60514 Brine Cam 3 18 60514 01 Brine Cam 6 36 60514 02 Brine Cam Minutes 60510 Coupling with Clip and Screws 60040 Bypass Brass 3 4 NPT Cold Water 60041 Bypas...

Page 11: ...Fleck 4650 AP10 11...

Page 12: ...2010 Pentair Residential Filtration LLC 40261 Rev C AP10...

Reviews: