Installer manual Fleck 4600 MECH - Maintenance
Ref. MKT-IM-027 / C - 12.11.2019
65 / 92
9.4.3
Power head disassembly/replacement
1. Disconnect the meter cable (
1
), if available.
2. Using a flat screwdriver, unscrew (
5
) and remove the cover (
4
).
3. Using a flat screwdriver, unscrew (
3
) and remove the washer (
2
).
4. Using a flat screwdriver or an 8 mm wrench, unscrew (
7
) and remove the power head (
6
) from
the valve body (
8
).
5. Change the power head (
6
).
6. Reverse above procedure steps to rebuild.