background image

START-UP PROCEDURE: 

Pentair Intellichlor 

SALT SYSTEM  

 

 

This is a simplify start-up version, but as the new owner of a 

Pentair Intellichlor

 system, we strongly recommend the reading 

of your owner’s manual 
 

 

Before starting, make sure the pool is clean.  Normally, after the installation, as in the spring, the 
pool requires a good cleaning.  You can refer to the owner’s manual for instructions on cleaning 
in the Waste Filter Mode.  

 

 

Before beginning, the pool must be functioning but your 

Intellichlor

 

system must be 

unplug. 

 

 

Pour the recommended quantity of salt in the deep end of the pool. (See table below) 

 

 

Wait approximately 48 hours for the salt to completely dissolve, do not perform a 

Backwash

 or 

Waste 

during this period. 

 

 

After 48 hours, you are ready to do your first PPM reading. To do so, connect you Intellichlor 
and let it work for about 5 to 10 minutes, then check on your board your 

«Salt level», 

adjust 

your salt level if needed. 

 
 

 

On your board, go to «

Sanitizer Output» 

to set your system at

 

60% using «

More»

. Let your system work 

for about 2 days. Then, test your pool chlorine level using your test kit 
(yellow drops).If the concentration of chlorine is to high press «

Less»

 

under Sanitizer Output on your board. In contrary, if the concentration of 
chlorine is too low, press «

More

» under Sanitizer Output on your board. 

 

 
Always use «

Less»

 or «

More» 

touch under

 Sanitizer Output 

to set and 

adjust your % of chlorine production. 
 
 
Over the summer, the % of chlorine production will probably have to be 
change depending on your use of the pool, the water’s temperature, the 
ambient temperature and the length of days (for example, the need for 
chlorine will be increasing during a heat wave and will decrease when it’s 
cold.).  

 
   

***

 When opening a pool that already have a salt system (where the water was salted the previous year), 

follow the same steps but pour in the water 

half of the quantity of salt indicated in the table below. 

For 

example, an F-3 will need 1½ bag of salt (only once the spring shock treatment has been done, the cleaning of 
the pool is finish and the water level of the pool is reaching the middle of the skimmer along the two arrows) 

***

 

 

Quantity of salt bags by pool  

MODEL 

SALT BAG 

MODEL 

SALT BAG 

MODEL 

SALT BAG 

F-1 /F-2 : 

¾ BAGS 

F-9 / F-21 : 

3 ½ BAGS 

F-11 : 

2 BAGS ½ 

F-3 /F-7/ F-18/ F-23 : 

4 BAGS  

F-8 /F-12 /F-22 :  

4 ½ BAGS 

 

 

F-10 /F-14 /F-15 : 

5 ½ BAGS 

F-16 : 

6 BAGS 

 

 

Reviews: