Pump
Notes
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
______________________________________________
8
10.Examine all O-rings for nicks
be fore re us ing.
11.Use Locktite® (red) on socket
head locking screw in end
of shaft.
12.Before refilling chamber with
oil, air test as described in
replacing stator.
13.Refill both chambers with oil
as described in replacing stator.
14.Always check all leads with
high voltage or with Megger
for grounds before operating
the pump.
15.Check pump for proper
rotation before re turn ing to
normal ser vice.
CONNECTION DIAGRAM FOR LEADS IN
MOTOR AND CONNECTION BOX
(Y) WYE MOTOR CONNECTIONS
230 VOLTS
460 VOLTS
GREEN
GREEN
L3
L2
L1
L3
L2
L1
3
2
1
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
Summary of Contents for HYDROMATIC H4QX
Page 9: ...Motor End Parts 9 ...
Page 19: ......