background image

ENGLISH

Make sure that there are no toxic gases in the working area.
Observe the health and safety at work regulations and make 

sure that a first-aid kit is to hand.

In some cases, the pump and the pumping medium may be hot 
and could cause burns. 
For installations in areas subject to explosion hazards, special 
regulations apply! 

USE

The buoyancy proof wastewater pump chamber SKS-B 800 is 
used for estate drainage applications. It is suitable for class A 
15, B 125 and D 400 locations. The segmented design enables 
easy transport and relocation.

The SKS 1000 can be relocated on firm undisturbed soil with

-

out the need for any concrete work. The maximum operating 
pressure of the pressure pipe may not exceed 6 bar.
The carefully mounted pump sump system meets the minimum 
requirement of 0.5 bar waterproof according to DIN EN 1610.

Scope of supply single unit

The poly-sump consist of an underpart with an inlet and a dis-
charge branch, an extension element, a cone 1000/625 and a 
concrete support ring for the manhole cover (accessory). The 
individual segments are sealed with sealing rings.
Inlet socket DN/OD 160 (DN 150) for PVC collar (KGU), 2 sockets 
DN 100 for ventilation/cable duct, 1 socket plug DN 100 
Guide rail system, pressure pipe DN 50, ball leak valve DN 50, 

maintenance valve DN 50 and flushing connection option are 

already mounted in the underpart.

Scope of supply duplex unit

The poly-sump consist of an underpart with an inlet and a dis-
charge branch, an extension element, a cone 1000/625 and a 
concrete support ring for the manhole cover (accessory). The 
individual segments are sealed with sealing rings.
Inlet socket DN/OD 160 (DN 150) for PVC collar (KGU), 2 sockets 
DN 100 for ventilation/cable duct, 1 socket plug DN 100
Coupling system, pressure pipe DN 50, ball leak valves DN 50, 

maintenance valve DN 50 and flushing connection option are 

already mounted in the underpart.

Transport and storage

   

Store pump sump parts on level surfaces and only stack 

horizontally on top of each other!

   

If possible, store sealing rings at room temperature!

   

Use textile lifting straps when lifting with forklift trucks or 

excavators!

   

When transporting, secure all pump sump elements against 

displacement and impact stress. The components must not 
be deformed during bracing.

ELECTRICAL CONNECTION

By using our control units, you can be sure that the require-

ments of the EC type-testing certificate are met. 

NOTE!

 Only qualified electricians may carry out electrical work 

on the pump, plug or the control unit. 

Current applicable standards (such as EN standards), national 
regulations (such as VDE in Germany), and the regulations of 
the local power supply companies must be complied with.

NOTE!

 When connecting the pump, coil up enough cable in the 

pump sump to enable the pump to be lifted out of the pump 
chamber for maintenance work. 

Additional potential equalisation on site

According to a statement made by the German inspection au-
thority TÜV Nord in March 2008, it is not necessary to provide 
any additional potential equalisation on site for Jung Pumpen 
concrete and plastic sumps in Ex zones 1 or 2.
Exception: If conductive parts such as a corrugated tube cable 
protection or a metal pressure pipe lead to the pump chamber 
connection from outside. In these cases, an electrically con-
ductive connection must be made with the pump housing(s). 
For corrosion protection reasons, stainless steel should be 
used for this connection. In Germany, for example, the dimen-
sioning must comply with Part 540 of VDE 0100 (from the As-
sociation of German Electrical Engineers). It should be taken 
into account that the resistance of stainless steel is 42 times 
that of copper.

Level control

Single units use submersible drainage pumps with built-in level 
control. 
Duplex units use pumps without built-in level control. In this 
case, additional level sensors and a control unit are required.
The air hose for the electropneumatic level sensors or the con-
necting cable for the submersible ball contact switch is hooked 
into the mounting bracket with a PG 11 cable gland. The cable 
can be adjusted to the appropriate dimension by loosening 
the cable gland, more detailed information can be found in the 
manual of the control unit. 

   

Summary of Contents for SKS 1000 Series

Page 1: ...JUNG PUMPEN DE B 49744 10 2020 03 DE Original Betriebsanleitung EN Instruction Manual SKS 1000 SKS D 1000 50 SKS D 1000 D50 ...

Page 2: ...2 ...

Page 3: ...ng Wartung Inspektion und Montage muss die entsprechende Qualifikation für diese Arbeiten aufweisen und sich durch eingehendes Studium der Betriebsanleitung ausreichend informiert haben Verantwortungsbereich Zuständigkeit und die Überwachung des Personals müssen durch den Betreiber genau ge regelt sein Liegen bei dem Personal nicht die notwendigen Kenntnis se vor so ist dieses zu schulen und zu un...

Page 4: ... mit Gabelstaplern oder Baggern Textiltragegur te verwenden Beim Transportieren alle Schachtelemente gegen Verrü cken und Schlagbeanspruchung sichern Beim Verspannen dürfen die Bauteile nicht verformt werden ELEKTROANSCHLUSS Durch den Einsatz unserer Steuerungen haben Sie die Ge wissheit dass die Forderungen aus der EU Baumusterprüfbe scheinigung erfüllt sind HINWEIS Nur eine Elektrofachkraft darf...

Page 5: ...geeig net Bitte verwenden Sie als Füllmaterial nicht bindigen Boden wie Sand Kies oder gebrochenes Material mit einer Korngröße von 2 bis 20 mm ohne spitze und scharfkantige Bestandteile Verfüllen Sie dann in jeweils 30 cm hohen Schichten und ver dichten Sie den Boden auf 97 DPr HINWEIS Der Schacht und die einzelnen Elemente dürfen beim Verfüllen und Verdichten nicht einseitig belastet werden Bei ...

Page 6: ...weitergeleitet wird Dann wird der Bauzeitschutz entfernt und die entsprechende Abdeckung Zubehör aufgelegt 9 Montage der Pumpe HINWEIS Vor dem Einhängen der Pumpe die evtl eingedrun gene Erde Kies oder Sand aus dem Schacht entfernen Bei der Erstmontage und nach jeder Wartung der Pumpe die Kupplungsflächen mit säurefreien Fett einstreichen um die Demontage nach langen Wartungsintervallen zu erleich...

Page 7: ...danger to people Warning of electrical voltage NOTICE NOTICE Danger to equipment and operation Qualification and training of personnel All personnel involved with the operation servicing inspection and installation of the equipment must be suitably qualified for this work and must have studied the instruction manual in depth to ensure that they are sufficiently conversant with its contents The sup...

Page 8: ...If possible store sealing rings at room temperature Use textile lifting straps when lifting with forklift trucks or excavators When transporting secure all pump sump elements against displacement and impact stress The components must not be deformed during bracing ELECTRICALCONNECTION By using our control units you can be sure that the require ments of the EC type testing certificate are met NOTE ...

Page 9: ...ase use non cohesive soil such as sand gravel or crushed material with a grain size of 2 to 20 mm without sharp and sharp edged constituents as filling material Fill in layers of 30 cm at a time and compact the soil to 97 DPr NOTE The pump sump and the individual elements must not be loaded on one side during filling and compaction If a groundwater lowering system is used to create the excava tion...

Page 10: ...planned to the road substructure Then the construction time protection is removed and the cor responding cover accessory is put on 9 Installing the pump NOTE Before fitting the pump remove any soil gravel or sand inside the pump chamber During initial installation and after each pump service coat the coupling surfaces with acid free grease to facilitate disassem bly after long service intervals MA...

Page 11: ...11 Class B h 125 mm Class D h 160 mm ...

Page 12: ... property of Pentair Third party registered and unregistered trademarks and logos are the property of their respective owners 2020 Pentair Jung Pumpen Jung Pumpen GmbH Industriestr 4 6 33803 Steinhagen Deutschland Tel 49 5204 170 kd jung pumpen de ...

Reviews: