background image

3

 WINDOW PREPARATION (AWNING and CASEMENT ONLY)

The interior frame covers must be removed to provide access to the pre-drilled frame screw 

installation holes.

CAUTION: To Avoid Interior Frame Cover Breakage - Carefully read and understand 

the following steps before proceeding with cover removal.

CASEMENT

COVER 3

COVER 1

COVER 2

FIXED AW/CM

COVER 3

COVER 1

COVER 2

LARGE AWNING

COVER 3

COVER 1

COVER 2

STANDARD AWNING

COVER 3

COVER 1

COVER 2

Note:  The following interior frame cover removal steps are for Casement, Standard 

Awning, Fixed Awning/Casement and Large Awning. The steps are similar for each, but 

the order in which covers are removed will vary depending on the window type.

AWNING/

CASEMENT

A. 

Prepare the Window.

1.  Remove the screen and set aside.

Hook

Spline Hole

Bend in Tool

Construction Handle Tool

REFERENCE DESCRIPTION

2.  Use pliers to remove the plug(s) from the lock 

handle location(s).

3.  Remove the construction handle tool from the 

handle package.

A2

Construction Handle Tool may be used as a 

 

lock handle or crank handle.

The order of interior frame cover removal is indicated below. Use reverse order 

for re-installation of covers.

Summary of Contents for 80YV0102

Page 1: ...ALLED EXTERIOR INSERT REPLACEMENT WINDOW EXISTING WINDOW EXTERIOR REMOVE EXISTING SASH and STOPS EXTERIOR Always read the Vinyl Window and Door Limited Warranty before purchasing or installing Vinyl W...

Page 2: ...e existing window frame and repair or replace any defective or rotted wood parts Remove or seat any nails B Clean the opening of any dirt debris or excess old paint before proceeding Chisel off any hi...

Page 3: ...ame cover removal steps are for Casement Standard Awning Fixed Awning Casement and Large Awning The steps are similar for each but the order in which covers are removed will vary depending on the wind...

Page 4: ...behind the cover While keeping tension on the tool pull the tool away from the frame to start releasing the cover barbs from the frame kerfs B3 Cross Section of Interior Frame Cover with Tool Placeme...

Page 5: ...of the cover Slide the tool over while pulling up on the cover Continue along the length of the cover until it is removed C4 C4 NOTE Cover support bracket AWNING CASEMENT D Remove Interior Frame Cove...

Page 6: ...les at the jambs and into the opening sides D Plumb and square the window Insert shims between the window frame and the rough opening at the anchor hole locations in the window frame Keep shims back 1...

Page 7: ...hole through the mullion plates at the factory drilled anchor holes prior to inserting screws 42 Frame Width Vent Fixed Casement Large Awning 42 Frame Width Vent Fixed Casement Large Awning Mullion p...

Page 8: ...g Mullion plate If Frame Width 42 top and bottom screws are optional Mullion plate 3 High Combination Vent Fixed Casement Standard Awning Large Awning Number of factory drilled fastener locations may...

Page 9: ...renced in Step C4 inside the stop as shown While holding the support in place position the cover to align the cover barbs with the frame kerfs Press the cover barbs into the kerfs while working toward...

Page 10: ...ealant O If additional installation holes are needed drill a 5 32 installation hole through both the interior and exterior walls of the frame Counter drill a 3 8 hole through the interior wall only of...

Page 11: ...ion and the rough opening Follow foam manufacturer s instructions C Insert jamb hole plugs provided into each screw hole for single hung and double hung units Interior Finish or Trim The space between...

Page 12: ...the crank handle onto the stud Unlock open window then close and lock window E Fold the crank handle down and check alignment of knob with the pocket Note You may need to adjust the crank position on...

Page 13: ...he cam and lever meet Interior B Stop removed to show the lever and cam C AWNING CASEMENT E Push the screwdriver against the lock cam and rotate the bottom of the blade toward the lock lever This will...

Page 14: ...lla products in accordance with Pella installation instructions or the use of Pella products in wall systems which do not allow for proper management of moisture within the wall systems The determinat...

Reviews: