
5 of 7
ISSUED: 07-11-06 SHEET #: 055-9462-1
B
H
C
Note:
Refer to projector mount instruction sheet for attachment of projector mount to extension column.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
WARNING
Extension Column Application
Wrap pole clamp (
C
) around extension column (not
included) and secure with nylock nut (
G
). Hand
tighten all nylock nuts on pole clamp (
C
).
Note:
Pole clamp (
C
) will work with 1" to 1-1/2"
NPT pipe.
1
Slide top plates (
B
) together over pole clamp (
C
).
Slide M5 screws into keyhole slots and tighten as
shown in detail 1.
Note:
If M5 screws are inaccessible from the top,
remove them from top plates and insert from the
bottom using bottom holes and keyhole slots.
Align slots in top plates (
B
) with holes in pole clamp (
C
) and insert three M5 x 10 mm hex screws (
H
). Tighten
screws using open-end 8 mm wrench (not provided).
C
G
EXTENSION
COLUMN
(NOT INCLUDED)
B
M5 SCREW
KEYHOLE SLOT
C
DETAIL 1
1-3
1-1
1-2
BOTTOM HOLE
BOTTOM
KEYHOLE SLOT
Rotate top plates (
B
) and pole clamp (
C
) until top plates are parallel with projector. Then, tighten nylock nuts on pole
clamp using an open-end 1/2" wrench (not provided).
continue to step 2 on page 7...