PEERLESS HL4UN-002 Installation And Assembly Download Page 1

1 of 2

ISSUED: 06-03-11   SHEET #:120-9110-1

Insert two 1/4-20 x 1-3/4" carriage bolts (

A

into bottom of display base as shown in detail 1.  

Model:

 

HL4UN-002, HL4UN-002-Q10

Installation and Assembly:

Lock Down Hardware for Display Base Stands 

1

BOTTOM OF BASE

FRONT 

2

FRONT 

A

B

C

D

A

DETAIL 1

MEASURE  

DISTANCE

Measure distance between center lines of cut outs in 

bottom of display base. 

Use measurement to mark 

location of holes at point 1 and point 2, on table.   

Drill two holes using a 9/32'' drill bit.

POINT 1

POINT 2

• drill

• 9/32" drill bit

• 5/8" open box wrench

E

F

G

H

TOOLS NEEDED 

HL4UN-002

HL4UN-002-Q10

Description

Qty.

Part #

Qty.

Part #

A

1/4-20 x 1 3/4" carriage bolt 

2

520-1017

20

520-1017

B

M4 x 16 mm phillips trilobe screw

2

520-2621

20

520-2621

C

M4 x 16 mm socket pin screw

2

520-1087

20

520-1087

D

1/4-20 sloped nut 

3

530-0035

23

530-0035

E

M4 x 12 mm socket pin screw

2

520-1079

20

520-1079

F

#8 flat washer 

2

540-1001

20

540-1001

G

plastic cap

2

590-1294

20

590-1294

H

4 mm allen wrench 

1

560-9646

3

560-9646

Parts List

NOTE:

 Display and base may appear 

different than illustrated  

Reviews: