ISSUED: 09-30-02 SHEET #: 055-9109-5 12-22-04
Visit the Peerless Web Site at www.peerlessindustries.com
For customer service call 1-800-729-0307 or 708-865-8870.
1 of 3
Part Number
600-0032
560-9646
510-1121
055-1010
580-1070
Installation and Assembly -
Armor Lock Plus
™
Security Cable with lock for the
Vector Pro
™
, Vector Pro Plus
™
, Encore
™
or PRS-1 Projector Mounts
Model: ACC 020
Description
AA cable assembly, with loop end
BB 4 mm security allen wrench
CC #10-32 serrated washer head socket pin screw
DD cable adapter (for use with Encore Mounts only)
EE PRS interface plate (for use with PRS-1 Mounts
only)
Parts List
Qty.
1
1
2
1
1
Note: Actual parts may appear slightly different than illustrated.
AA
Before you start check the parts list below to make sure all of the parts shown are included.
If installing the security cable onto a Vector Pro and Vector Pro Plus
Mount, align holes of bracket from cable assembly (AA) to holes on
PJC 100 as shown in detail 1. Fasten cable assembly (AA) to PJC 100
with two #10-32 serrated washer head socket pin screws (CC), and
tighten using 4 mm security allen wrench (BB).
Insert key into lock. Then insert lock into slot on projector and turn key
counterclockwise 90° to lock. Remove key.
Note: If needed, when installing the cable assembly (AA), wrap the
cable around the PJC 100 to reduce slack in the cable.
BB
IMPORTANT! Read entire instruction sheet before you start installation and assembly.
CC
PJC 100
DETAIL 1
AA
CC
BRACKET
DD
If installing the security cable onto an Encore Mount, skip to step 2.
EE
If installing the security cable onto an PRS-1 Mount, skip to step 4.