Peco PRO 22 DFS Operator'S Manual Download Page 1

P

P

PECO

PECO

PECO

PECO

P

P

P

P

P

PECO

R

R

PTO DRIVEN GRASS
COLLECTION SYSTEM

 

Model#

752201, 752201-AM, 752202

OPERATOR

S MANUAL

MANUAL PART#: Q0059

Initial Release - Oct 2019

ASSEMBLY            OPERATION            MAINTENANCE

Briggs & Stratton 10HP Vanguard

 

00752201 & 00752201-AM

Yanmar 7HP Diesel

00752202

Summary of Contents for PRO 22 DFS

Page 1: ...P PECO PECO R R R PTO DRIVEN GRASS COLLECTION SYSTEM Model 752201 752201 AM 752202 OPERATOR S MANUAL MANUAL PART Q0059 Initial Release Oct 2019 ASSEMBLY OPERATION MAINTENANCE Briggs Stratton 10HP Vanguard 00752201 00752201 AM Yanmar 7HP Diesel 00752202 ...

Page 2: ...n 21 SAFETY 2 Know the controls and how to stop them quickly READ THE OPERATOR S MANUAL 3 Do not allow children to operate the machine Do not allow adults to operate it without proper instruction 1 Read the operator s manual carefully and familiarize yourself with the proper use of your attachment Do not allow anyone who is not acquainted with the Safety Instructions to use your attachment 4 Be es...

Page 3: ...es and use caution when turning on any slope Safety Signs Should be followed by the operator to avoid accidents When This Safety Alert Symbol means ATTENTION BECOME Safety Alert Symbol This symbol is used to call attention to safety precautions that you see this symbol carefully read the message that follows The signal words DANGER WARNING and CAUTION are used on the equipment safety signs These w...

Page 4: ...to any business use agricultural commercial or industrial or used at multiple locations is considered Commercial Products designated as Commercial are warrantied for 12 months B SECURING WARRANTY ADJUSTMENTS PECO extends the following warranties to the original purchaser of each new PECO consumer product subject to the following limitations 1 PRODUCT WARRANTY Any part of any consumer product which...

Page 5: ...r Introduction The grass collection system is designed for turf maintenance where there is a need to collect the grass clippings as the mower cuts the turf It is also used for picking up leaves in pre season and post season clean up The engine blower blade assembly is mounted on the right side of the unit The blower draws grass clippings from the discharge area of the cutter deck up and back to th...

Page 6: ...termined secure the 2 lower lift arms to the Mounting Brackets by reusing the provided hardware Refer to Figure B NOTE Some part features have been hidden from view for visual clarity Securing Lower Lift Arm Reused Hardware Reused Hardware Top Link Arm Mower Preparations Lastly install 2 Mounting Brackets to the top link arm and lower lift arms Refer to Figure A for the positioning of the Mounting...

Page 7: ...t arms to the measured distance Link Plates Assembly Installation NOTE Some part features have been hidden from view for visual clarity Figure A Figure B Rear View Measure Left to Left Measure Right to Right Lower Link Plates Rear View Base Frame Base Frame Align the holes of the Lower Link Plates Item 1 to the second set of holes from the rear of the Base Frame Bracket Refer to figure B Secure th...

Page 8: ...bly until the Mounting Bracket of the Base Frame Assembly aligns with the top link hitch socket Secure the top link hitch socket using 1 3 4 x 3 Clevis Pin Item 1 and 1 7 16 x 1 3 4 Lynch Pin Item 2 Refer to Figure A Figure A Figure B NOTE Some part features have been hidden from view for visual clarity Check that the Main Frame Assembly is centered with the Top Link Arm and that the Top Link Arm ...

Page 9: ...tem 2 3 and 2 3 8 16 Flange Nut Item 2 5 Once secured tighten all hardware at this time Refer to Figure A Place the Engine Mount Arm Assembly Item 1 up under the Right side of the Base Frame Leg Align the hole of the Base Bracket to the hole on the Engine Mount Arm Assembly Loosely secure using 1 1 2 13 x 3 HHCS Item 2 1 and 1 1 2 13 Flange Nut Item 2 4 Refer to Figure A Engine Mount Arm Assembly ...

Page 10: ... position and place 2 Rubber Shock Absorbers Item 3 1 on top of the Engine Mount Arm Assembly Item 2 Next Position the B S 10HP Vanguard Blower Blade Assembly Item 1 on top of the Rubber Shock Absorbers with the Blower facing towards the front of the tractor Then secure the B S 10HP Vanguard Blower Blade Assy by using 4 5 16 18 x 1 3 4 HHCS GR5 Item 3 2 and 4 5 16 18 Nyloc Nuts Item 3 3 Refer to F...

Page 11: ... slots on the Switch Plate of the Throttle Cable Assembly refer to Figure A Align the mounting slots of the Switch Plate to the holes located on the Upper Crossbar Base Frame Assembly Secure the Switch Plate using 2 1 4 20 x 2 1 4 HHCS Item 2 1 and 2 1 4 20 Flange Nut Item 2 2 Refer to Figure B Figure A Figure B Switch Plate Mounting Slot Mounting Slot Upper Crossbar Base Frame Assy ...

Page 12: ...the throttle control lever into the slow position Rotate the engine throttle lever to the slow position Rotate the throttle control lever into the fast position to check for proper installation Rotate the throttle control lever to check for proper installation For the Yanmar 7HP To fasten the throttle cable end to the engine locate the throttle cable guide and receiver on the front of the engine R...

Page 13: ...with the provided Zip Ties P J0245 Wiring Kit Assembly Installation To connect the Wiring Kit P A2152 connect the 4 gage Red Wire P P0620 to the positive terminal of the starter solenoid on the engine Route the Red Wire from the solenoid to the positive terminal of the battery Refer to the Figures below for your respective engine Positive Terminal Connection Solenoid Negative Terminal Connection E...

Page 14: ...14 Wiring Kit Assembly Installation Continued Figure B ...

Page 15: ... into the hole of the Door Support of the Door Assy Secure the Door Rod Assy by using 1 Rue Ring Cotter Pin Item 3 and 1 1 2 Flat Washer Item 4 per Door Rod Assy Refer to Figure A below NOTE Some part features have been hidden from view for visual clarity Door Rod Pivot Assembly Installation Figure A Door Support ...

Page 16: ... below Door Rod Pivot Assembly Installation Continued Next assemble the Door Rod Pivot to the Base Frame Assembly by placing the straight end of the Door Rod Assembly Item 1 through the Door Rod Pivot Item 2 Secure each Door Rod Assy to the Door Rod Pivot with 1 1 8 Hair Pin Clip Item 6 and 1 1 2 Flat Washer Item 7 Refer to B NOTE Some features have been hidden from view for visual clarity Figure ...

Page 17: ...tch Handle Assembly Installation Figure A Figure B Latch Hook Pivot Pin Box Base Frame Assembly Secure the Latch Assy to the Base Frame Item 1 by positioning the Latch Assembly between 2 Latch Clamps Item 5 on the left and right side of the Base Frame Fasten the Latch Clamp to the Base Frame Assy by using 2 3 8 16 x 2 Carriage Bolts Item 3 and 2 3 8 16 Flange Nuts Item 4 per side Refer to Figure B...

Page 18: ... same procedures to the right side of the Base Frame Assy Next position the Latch Release Lever through the of the Base Frame Assembly Item 1 and over the Pivot Pin of the Door Assy Secure the Latch Release Lever to the Latch Rod Assy by using 2 1 2 13 Flange Nuts Item 5 Refer to Figures A and Figure B below Figure A NOTE Some features have been hidden from view for visual clarity Figure B Pivot P...

Page 19: ...and align four holes Fasten Inlet Ring Item 2 bottom holes using 2 5 16 IT Tooth Lock Washers Item 6 2 5 16 18 x 1 2 HHCS Item 8 See Figure B Fasten Inlet Ring Item 1 top holes using 2 5 16 IT Tooth Lock Washers Item 6 2 5 16 18 x 1 1 4 HHCS Item 7 Slide Debris Deflector Item 3 over inside top bolt threads Item 7 Fasten Debris Deflector Item 3 using 2 5 16 18 Ny Flange Lock Nuts Item 5 Final assem...

Page 20: ... screw holes of the Sight Glass Kit to those on the Aluminum Box and fasten the Sight Glass Kit to the Aluminum Box by using 8 10 12 x 3 4 Sheet Metal Screws Item 2 Refer to Figure B Refer to Figure C for the completed installation of the Sight Glass Kit Note Some parts and part features have been hidden from view for visual clarity Figure A Figure B Figure C Viewed from the left rear side of the ...

Page 21: ... the hoses need to be long enough to allow for the opening and closing of the collection system as well as allowing ample clamping surface between each component Slide a Hose Clamp P J0080 over both ends of the 8 Lower Hose Secure one end of the Lower Hose to the Blower Cone and fasten by tightening the Hose Clamp Lower Hose To Boot Installation Lower Hose To Blower Cone Installation Take the unat...

Page 22: ...ch vein with a hammer then try again Impeller Blade Removal Replacement To Replace Firstly apply anti seize to the 7 16 20 x 1 HHCS 1 Next place the Impeller Blade over the engine shaft Slide the Taper Lock Bushing 6 on to the engine shaft and into the Impeller Blade aligning the non threaded holes of the Taper Lock Bushing to the threaded holes of the Impeller Blade Fasten by using 2 1 4 20 x 1 H...

Page 23: ...23 A7501 Pro22 DFS Exploded View ...

Page 24: ...24 A7503 Pro22 DFS Exploded View ...

Page 25: ...25 A7500 Pro22 DFS Base Model Exploded View ...

Page 26: ...26 A7500 Pro22 DFS Base Model Exploded Parts List ...

Page 27: ...27 A0191 Door Assembly Exploded View ...

Page 28: ...28 A2236 Base Frame Assy Pro 22 Exploded View ...

Page 29: ...29 A2234 Base Frame Assy 3 Pt Hitch Exploded View ...

Page 30: ...30 A1212 Throttle Plate Assembly Exploded View ...

Page 31: ...31 ...

Page 32: ...32 ...

Page 33: ...33 ...

Page 34: ...ocal Service Center for replacement decals Part R1054 Important Hose Wear Part R1051 Warning Hearing Protection Part R1069 Warning Turn Off Blower Part R2007 Danger Never Use Hands Part R2008 Danger Rotating Blades Part R1057 2 Red Reflectors PECO Logo Part R1070 Part R0024 Danger Keep Hands Clear Part R0025 Danger Rotating Blades Designed Built In The USA Part R0022 P PECO PECO P P P P PECO PECO ...

Page 35: ...lch no if grass is extra tall terrain is flat or hilly etc Mow twice at different height settings high then low Unloading The Collection System back and release the collection unit s latch handle F Pivot the collection unit back using the dump handle to dump the clippings B Disengage the mower deck NOTE Do not allow the collection unit to become over filled as potential damage may occur to your eq...

Page 36: ...lection system owners should record the name and telephone number of their Service Center Your Service Center will be happy to supply replacement parts accessories and do any service or repairs to your collection system If for any reason your Service Center is unable to service your collection system or supply replacement parts contact New PECO Inc and include the following information on the char...

Page 37: ...37 ...

Page 38: ... too long Ground speed is too fast Loose belt Grass is too wet Low engine speed Worn belt Collection bags are too full system at full throttle Always operate collection Cut the grass several times Drive slower at full throttle Dump more frequently Cut grass when it is dry Replace belt Adjust the pulley and tighten belts Debris blowout Plug clog in the collection system Collection bags are too full...

Page 39: ...39 Notes ...

Page 40: ...ECO PECO PECO PECO PECO PECO P P P P P P P P PECO PECO R R R New PECO Inc 10 Walden Dr Arden North Carolina 28704 Phone 1 800 438 5823 828 684 1234 Fax 828 684 0858 Email peco lawnvac com Website www lawnvac com ...

Reviews: