background image

Controlpro

User manual 

Summary of Contents for Controlpro Dual-Core 4 GB RAM 250 GB SSD

Page 1: ...Controlpro User manual...

Page 2: ...pro in a safe manner Please study this manual carefully before working with the device This applies to all persons who come into contact with the device These instructions are an integral part of the...

Page 3: ...s if improperly installed Installation and commissioning may only be carried out by specially trained personnel qualified electricians Avoid damage to the panel Only use the panel in perfect condition...

Page 4: ...pply 13 3 9 Controls 13 3 9 1 Graphical user interface 14 3 9 2 Connections for external mouse and keyboard 14 4 Scope of delivery 14 5 Important safety and handling information 15 6 Installation and...

Page 5: ...ing the panel off and back on 24 9 1 2 Disconnecting the panel from the power supply 24 9 2 Windows has unrecoverable problems 25 9 2 1 Restoring the operating system from the Recovery USB flash drive...

Page 6: ...see chapter 9 3 2 Intended use Depending on the software used the Controlpro serves as control unit for the entire KNX installation across rooms It thus also serves as a status display The device must...

Page 7: ...nd with other Windows compatible software 3 1 1 Operating system The operating system used is Microsoft Windows 10 IoT Enterprise LTSC All com ponents required for the unit to function have been pre i...

Page 8: ...n be found in the YOUVI Help which can be opened in the program YOUVI Dashboard Help Here you will also find the current range of functions of the software under YOUVI Visu Scope of functions 3 1 3 Op...

Page 9: ...Controlpro User manual 9 3 3 Components Position Description Dimensions H x W x D A1 Flush mounted box 312 x 528 x 65 mm A2 Panel with touchscreen 320 x 535 x 50 mm A3 Glass cover 330 x 560 x 1 8 mm...

Page 10: ...h panel front view Position Description B1 4 x screw holes for fixing the panel B2 4 x intake for glass cover B3 Microphone B4 Camera B5 Ventilation openings B6 Touchscreen B7 2 x USB 2 0 status LED B...

Page 11: ...rolpro User manual 11 3 5 Touch panel rear view Position Description C1 Power supply 15 20 V DC C2 Power supply GND C3 KNX terminals KNX WAGO 243 211 conductor diameter 0 6 0 8 mm 3 6 Touch panel top...

Page 12: ...lti touch projected capacitive PCAP touch technology Integrated speakers and microphone Integrated camera with sliding shutter Fieldbus connection for KNX Gigabit Ethernet port Operating system Window...

Page 13: ...ort Note Make sure to install the correct cabling standard to fully use the 1 GB LAN at least Cat 5 3 8 3 Power supply The plug in terminal for the voltage supply has a usable wire cross section of 0...

Page 14: ...panel USB ports available There are two additional USB ports on the panel front under the glass cover for example to use a USB adapter for a wireless keyboard and mouse or to transfer data onto the p...

Page 15: ...ns Observe the national regulations applicable in your country regarding installation functional testing repair and main tenance of electrical products Observe the Five Safety Rules DIN VDE 0105 EN 50...

Page 16: ...that of the Gira Control 19 6 1 Information for electricians Note We recommend fusing the panel separately because in rare cases it must be completely disconnected from the power supply see section 9...

Page 17: ...h the holes in the flush mounted box Screw the flush mounted box to the wall Tip During the filling of the edges the template can be used as a splash guard 6 2 2 Installing the flush mounted box in a...

Page 18: ...5 A at 15 V Disconnect the pluggable screw terminal C1 2 from the Controlpro Connect the cable cores of the power supply unit to it 6 3 2 Preparing the voltage source for the flush mounted box Partic...

Page 19: ...able to the left side of the luster terminal as shown in the picture Depending on the flush mounted box some times it is necessary to extend the 230 V side of the power supply Use the Controlpro 230 V...

Page 20: ...anel Push the prepared 15 20 V connector terminals back into the appropriate connectors in the panel C1 and C2 Connect the Ethernet cable to the panel D4 Plug the KNX cable with the colors red and bla...

Page 21: ...ery state the panel automatically logs on with the user name Controlpro without a password After the login additional users can be added at any time or further settings may be changed in the Windows S...

Page 22: ...g a backup on the Recovery USB flash drive After initial commissioning it is advisable to create a backup with the optionally available Recovery USB flash drive In case of serious errors in Windows it...

Page 23: ...over and touchscreen must be cleaned regularly to ensure proper ope ration This will prevent residues caused by use e g fingerprints or dust from impairing the touch function Suitable cleaning cloths...

Page 24: ...pro no longer reacts to input on the touchscreen which may occur in rare cases following Windows updates try to reboot the panel If the problem persists disconnect the panel from the power supply as s...

Page 25: ...rolpro manually see above Connect the Recovery USB flash drive to the USB port Switch on the panel Paragon starts from the Recovery USB flash drive The Main View is displayed Select Restore backup The...

Page 26: ...25 10 Technical data Supply Power supply 15 20 V DC Max current during operation 4 A during the PC boot process 4 5 A at 15 V Connection terminal 0 75 to 1 31 mm usable wire cross section KNX bus volt...

Page 27: ...imum brightness 350 cd m Viewing angle horizontal vertical left right 89 89 up down 89 89 Touch technology Projected capacitive touch PCAP Multi touch Peripherials Speakers Broadband stereo Microphone...

Page 28: ...m Environment Ambient temperature Operation 0 to 35 C Storage transport 20 to 60 C Relative humidity Operation 10 to 85 r H no condensation Storage transport 10 to 85 r H no condensa tion from 40 C 10...

Page 29: ...ed by the attached CE label The considered standards can be found in Chapter 10 Technical Data The complete declaration of conformity can be found on the following page Disposal notes Do not dispose t...

Page 30: ...Controlpro User manual 30...

Page 31: ...the lon gevity of the products and the qualitative interaction of design and functionality As the newest division of the PEAK group headquartered in Darmstadt Germany PEAKnx can draw from more than 25...

Page 32: ...www peaknx com...

Reviews: