background image

Precision Hydrogen SL Installation Guide Rev 3 RSID 3515 EN 10/03/21

Precision SL 

(All Models)

Installation Guide

Summary of Contents for Precision SL 100

Page 1: ...Precision Hydrogen SL Installation Guide Rev 3 RSID 3515 EN 10 03 21 Precision SL All Models Installation Guide...

Page 2: ...llation and configuration Please visit www peakscientific com downloads to download the full User Manual for your gas generator Werecommendthatyouread andunderstandthefullusermanual prior to following...

Page 3: ...a hazard It calls attention to an operating procedure process or similar which if not correctly performed or adhered to could cause damage to the Generator or the Application Do not proceed beyond a...

Page 4: ...29 US Mains Cable C13 5 15 04 1039 US Mains Cable C13 6 15 04 1029 4L Water Bottle 10 9016 x1 x1m Tygon Tubing 05 3131 supplied with all models supplied with automatic and pressure fill models x4 in 2...

Page 5: ...g crate as per the instructions on the box and position on a flat surface in desired area 1 2 Ensure that there is at least 7 5 cm of space to the sides and rear of the generator to allow sufficient a...

Page 6: ...Page 6 To fit the Desiccant Cartridge 3302583 first open the top panel by lifting gently 3 4 Loosen and remove the cap of the desiccant dryer by turning counter clockwise...

Page 7: ...Page 7 Fit the Desiccant Cartridge 3302583 5 6 Replace the cap and hand tighten by turning clockwise...

Page 8: ...Page 8 Fit the DI capsule 3302581 into the recess and rotate 90 clockwise to lock in position 7 8 Close the top panel...

Page 9: ...options following step below 9 For Precision H2 SL equipped with auto water fill or pressurised water fill the Tygon Tubing Barbed Fitting and In Line Filter supplied in the generator fittings kit sho...

Page 10: ...tubing to the Application Connect tubing to the H2 delivery port at the rear of the generator using the 1 8 swagelok compression fitting provided Use new laboratory grade copper or stainless steel tub...

Page 11: ...ppropriate mains cable from the fittings kit and plug the IEC 60320 C13 cable into the mains input at the rear of the generator Please note both 110V and 230V US cables have been supplied ensure corre...

Page 12: ...0 240VAC 50 60Hz single phase power supply CAUTION ensure the correct cable has been selected for your electrical supply 100 240VAC 50 60Hz 100 240VAC 50 60Hz CAUTION UK EU US 110V US 230V 16 Turn the...

Page 13: ...EDs will be solid In the unlikely event that diagnostics are unsuccessful the LEDs will turn orange See Table on Page 15 17 18 Pressing the front button will begin the supply of gas to the application...

Page 14: ...rator and application is stable gas will be supplied by the generator as normal To prevent excess release of hydrogen in the event of a leak between the generator and application the generator s outpu...

Page 15: ...fe of the Generator Ensure that all pipework between generator and equipment is checked for leaks Please familiarise yourself with the full User Manual available at www peakscientific com downloads Th...

Page 16: ...er to the chart below for information regarding the different states LED Indicators Pressurizing Mise sous pression Green Vert At Pressure pression Green Vert See Manual Voir manuel Amber Ambre Contac...

Page 17: ...w peakscientific protected Alternatively you can send the completed form to Peak Scientific by post or email at warranty peakscientific com Product Warranty Registration Contact name Email address Com...

Page 18: ...Page 18...

Page 19: ...Page 19...

Page 20: ...oss every continent around the world This allows us to provide an industry leading rapid response service to our customers With Peak Protected your laboratory s productivity becomes our top priority T...

Reviews: