15
FIG.13
11. INDICATOR STAND
The weigh indicator support stand can be placed on any of the four legs of
the immobilizer to suit easy reading by the operator. Place over the leg and
tighten the bolt to prevent movement. The leads are connected to the
weigh bars underneath machine. Make sure the indicator and leads are
out of the way of sheep and operator movements
12. AIR IN & BATTERY
Connect your main air line from compressor to the inlet on the IMMOBI-
LIZER (using RYCO 200 Series slide back coupling). If you normally use
another brand of fitting you can remove the nipple supplied and replace
with your preferred brand, thread size is 1/4 BSP
Check that the 2-pin plug on the power cable is properly insterted into the
machine and is screwed tight
Connect the aligator clips to your battery ensuring polarity is correct. ie
red wire to positive and black wire to negative on the battery terminal
The top LED on the panel should now be indicating the battery is
connected
KEEP HANDS AND LIMBS CLEAR OF ALL WORKING PARTS
MACHINE WILL BE OPERATIONAL
Summary of Contents for IMMOBILIZER SHEEP WORKER
Page 2: ......
Page 23: ...23 NOTES...