Getting started
4.1
Power supply
Three 1.5 V AA batteries are required for power supply. The battery compartment is located on
the back of the instrument and is secured with two screws. Before replacing the batteries, switch
off the device. Loosen the screws, lift off the cover, insert the batteries as marked and close the
battery compartment again by tightening the screws.
4.2
First use
Before switching on the instrument, insert the probe into the probe socket of the instrument. To
start the meter, press the on/off & menu key until the display shows the name of the meter. The
interface for measuring the sound velocity will then open. The thickness of the material is
determined by measuring the sound velocity. The measurement can be started here.
5
Menu
The menu of the meter can be reached by pressing the menu key
after start-
up. With the arrow keys , you can navigate through the menu. You can
confirm your selection with the OK
key. To navigate one step back, press
the back key
.
5.1
Measure
In this menu item, make the measurement settings:
d.
Material to be measured (sound velocity)
e.
Unit of measurement m/s (unit)
f.
Resolution
5.2
Probe (PCE-TG 150 only)
In this menu item, select the probe you want to use for the measurement.
5.3
Limit
In this menu item, make the limit value settings:
c.
Set the upper and lower limit value for the measurement
d.
Enable or disable the alarm for exceeded limit values
5.4
Memory
Measurement processes can be saved and started under this menu item. If you activate
"Auto save", all measuring processes are saved automatically.
d.
Select a directory in which the measurement is to be saved.
e.
View saved data
f.
Delete the data of the selected file