4 Commissioning [specialist]
18
997655810x-mub-en – V08
2020/10
4.4
Setting the solar installation
1.
Set the desired revolution speed of the solar pump depending on the required flow rate.
If necessary, the flow rate can be reduced by the ball valve [3.1] (only necessary if the pump
is not speed-controlled).
Please observe the specifications of the collector manufacturer for the correct adjustment of
the flow rate.
2.
Mount the insulating front shells of the solar station.
3.
Set the automatic mode on the controller (see controller manual).
The commissioning of the solar installation is now completed. Please fill in completely the
commissioning log on page 29.
Scale:
3-22 /min
Reading edge =
round edge of the float
Example:
about 4 l/min