
Connect with Web GUI
86
CopperLink CL2300 User Manual
11
• Wizard Interface
Figure 22. Basic Setup
User Access: (optional configuration)
Users may change the password for the admin user.
Management IP Setup
•
Static:
create your own IP address, netmask and gateway (optional-the gateway is required for remote manage-
ment).
•
DHCP:
The CL2300 management port will accept an IP address from a DHCP server.
•
Both:
This choice will assign two IP addresses (one static and one DHCP to the management port.)
•
Management VLAN ID:
(optional) define a VLAN ID for management traffic.
Line Setup
This is where you can manually set your CopperLink line options.
Note
The Copperlink Ethernet Extenders by default are set to plug-and-play oper-
ation