
22
Maverick Boat Group
3207 Industrial 29th St. • Fort Pierce, Florida 34946
(772)-465-0631
•
Pathfinderboats.com
Always use the recommended breaker/fuse amp sizes. Oversizing or using larger
breakers/fuses than required can lead to electrical shorting and possible damage or
destruction of the entire electrical system.
There are open slots on both the ground block and the breaker panel for additional
electrical hook-ups. The accessory switches should be used for any additional hook-ups
to protect the entire electrical system. All additional electrical hook-ups should be
performed by a qualified marine electrician.
As a standard practice, we run pull cords forward and aft for any additional wiring
needs. For your convenience and ease we have included a nylon rigging string that runs
through the rigging tubes and terminates in the bow. The nylon string will allow you to
easily run any additional wiring through the rigging tubes, thus protecting them from
outside elements. We also run a string aft to the rigging box.
Standard Features
Locking Rod Storage
The Pathfinder 2600 TRS comes standard with both
forward port and starboard lockable rod lockers. These
lockers allow you to safely leave your rods in the boat if
you ever have the occasion to leave them unattended.
They also have large openings with gas shock assisted
lids that open from the back allowing for quick and safe
storage and retrieval of rods. Independent tubes
forward protect brittle tips on rods up to 9 feet.
Under Gunwale Rod Storage
The 2600 TRS comes standard with under gunwale rod racks on both the port and
starboard sides. These give you space to safely store an additional 4 rods for your fishing
needs.
Salt Water Wash-Down
Salt-water washdown is standard on the 2600 TRS. The pump is located in the bilge
forward of the livewell pump and is accessible through the splashwell hatch or the aft
port hatch. To operate, hook a hose to the raw water receptacle in the aft section of the
rod locker. Flip the switch labeled “Saltwater”. The pump wi
ll pressurize the system with
Locking Rod Storage