Parry
-British Built for Purpose
IN133-7
10
Operating Instructions
Please note that not all units are heated.
Plug machine in to power supply. The red indicator light will show to indicate power
to the unit.
Turn the cabinet dial to the required setting, the right-hand side green lamp will
show indicating power to the element, this will extinguish when the desired
temperature is reached.
This procedure will be repeated automatically as the thermostat maintains a constant
temperature. The cabinet temperature is shown on the digital display on the fascia
When loading the machine please leave some space around the rack to give good airflow,
never cover racks with tin foil, otherwise the efficiency of the machine will be reduced.
Operating the quartz lamp gantry
(not all units come with the
“Chef Rack”
gantry)
Units which have quartz lamp gantry have two mains power cables.
Ensure both power cables are plugged in to the mains and turned on
To turn on the lamp gantry use the on/off switch on the fascia.
Summary of Contents for HOT12
Page 2: ......