background image

Loop Detector Settings

PF8000

Summary of Contents for PF8000

Page 1: ...O M Manual Revision 4 4 PF8000 TypeB PF8000 TypeB Automatic Rising kerb Maximum Span 5 Metres Duty Cycle 100 Instructions For PF8000 GB ...

Page 2: ... documentation Any other use not specified in this documentation could damage the product and be dangerous The Company declines all responsibility for any consequences resulting from improper use of the product or use which is different from that expected and specified in the present documentation Do not install the product in explosive atmosphere The construction components of this product must c...

Page 3: ...to reduce injuries and ill health arising from the movement of goods from supplier through haulier to the recipient and end user including any home deliveries The project will focus upon the delivery and collection of goods and the hazards this generates It covers the main areas that cause the majority of injuries and ill health to workers including ŸWorkplace transport ŸSlips trips and ŸMusculosk...

Page 4: ... 5KW E131 E132 AND E133 1 STATION CETOP 3 MANIFOLD C W GAUGE PORT 5073 SUITS UP100 SUC STRAIN 6L 7L 15L VERTICAL RESERVOIR 1 2CC 2 5CC PUMPS CETOP 3 SOLENOID OPERATED DIRECTIONAL CONTROL VALVE CETOP 3 MOD P OP CHECK 0 5 C P AP100 3 5S309 UP100 GEAR PUMP 3 5CC REV 5 04L MIN 1440RPM 0 75KW 415V 3PH 50HZ 4PL B34 ELECTRIC MOTOR 8 LITRE VERTICAL STEEL TANK L08 OR 01 UP100 AC MOTOR FLANGE 0 55KW 0 75KW ...

Page 5: ...nnecting power cables and hoses Road Blocker To be installed across the roadway with the curved edge of the rising wedge fitted on the insecure attack side The wedge pivot points are to be positioned on the secure side of the site The blocker may be sited on a rising or falling road surface and allowed to follow the line of the slope however the blocker must be the camber of the road Provision mus...

Page 6: ...reference drawings for visual guide to previous page Concrete Pad laid after dig for blocker to sit on Drain Earth wall 3 Ground Excavated Base Poured Blocker Lowered into hole eye bolts used to level blocker Backfill concrete around blocker ...

Page 7: ... before attempting any work ŸA Maintenance Contract should be sought from a specialist company after a maximum of 5000 manoeuvres or 1year from the install date ŸOccasionally clean the photocell optical components and make sure they are free from dirt water rain soil etc ŸHave a qualified technician installer check the correct setting of the electric clutch ŸIf the power supply cable is damaged it...

Page 8: ... its compatible with all types of access control and can be operated to the customer s exact specification Technical data Construction All welded steel RHS Cover Plates 6mm Durbar plates Drive Remote hydraulic power pack Finish Galvanised with black yellow chevrons Electrical supply 230v supply inverter driven for 3 phase motor output Sizes 2m 5m Control system To suit site requirements via a Schne...

Page 9: ...8 9 10 11 12 13 14 15 16 17 18 19 4 COM STOP COM LOWER COM RAISE LOWER PROX RAISE PROX SPARE RED GREEN EARTH U V W 20 21 22 23 24 24V DC LOWER SOLENOID RAISE SOLENOID MOTOR L N E Wiring Diagram Illustration PF8000 ...

Page 10: ...a vehicle breaking the safety loop the kerb will reverse if option is switched on and will stop if set to off Close delay This option allows the user to set a closing delay time upon vehicles leaving the safety loop Auto raise This option allows the user to set the kerb to rise on a timer if nobody drives through the system Auto raise timer A rais t in menu This option allows the timer to be set f...

Page 11: ...ty clo er arm light s For expla ll our servic ents please s de and Inf e used if Controller ssories e mmable Log ns a site spe ments within with the he le to send y ose Safety O ts magneti anations on ce departme e also conta formation upgrade e g beaco gic Controlle ecific progra n reason Al elp of our te you out an e Only and Sa c locks safe any of the ent on the n ct our servi n Software ons er...

Page 12: ...Loop Detector Settings PF8000 ...

Page 13: ...Loop Detector Settings PF8000 ...

Page 14: ...Loop Detector Settings PF8000 ...

Page 15: ...ning Loss of voltage Check motor supply test 3 phases Kerb not raising or lowering Drive shaft connections Re connect drive shaft Kerb raises slowly and lowers too fast Problem with hydraulic valves Check valves and settings The best way to approach any error is to take time be thorough and systematic in fault finding Before moving adjusting any mechanics ensure all power is disconnected to avoid ...

Page 16: ...barrel if making contact with emitter check 24DC supply to emitters Photo Cells Dirty if fitted Clean photo cells make sure they are debris free Motor running but Kerb does not move Permanent open signal Check PLC display 2 should not be highlighted If 2 is highlighted Kerb has a permanent open signal Mains on but no power Isolator fuse Check and meter fuse in isolator Loop detector green light on...

Page 17: ...Hydraulic Oil Spec PF8000 ...

Page 18: ...Hydraulic Hose Specifacation PF8000 ...

Page 19: ...tions undertaken Product works the way site need it to this includes no passage time out etc System has had the completed conformity certificate All items on the delivery note have been handed over to client site this should be signed for on the separate sheet which is titled Delivery Note green or yellow paper if parts missing call supplier The engineer has expressed the importance of regularly m...

Page 20: ...ccordance with the guidelines below at any point service repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log of any historical or recent modifications and or problems to help an engineer in the event of any future work required on the product PF8000 ...

Page 21: ...ce with the following documents Document Ref Revision Description PF8000 5 0 System guides and drawings as defined within O M Manuals Part 4 The following test procedures refer Check Lists pages 15 16 Commissioning Certificate Part 5 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Signing Position Parts Handed Over Qty ...

Page 22: ...ble is damaged it must be replaced by the manufacturer or its technical assistance service or else by a suitably qualified person in order to prevent any risk When any operational malfunction is found and not resolved disconnect the mains power supply and request the assistance of a qualified technician installer When automation is out of order activate the manual release to allow the opening and ...

Page 23: ...ormity with the essential Health and Safety requirements of the Machinery Directive 2006 42 EC and the following transposed harmonised standards BS EN 292 parts 1 2 1991 BS EN 60204part 1 1993 BS EN 294 1992 BS EN 349 1993 BS EN 418 1992 and BSEN13241 1 including other standards BS EN 12445 2008 BS EN 12453 2008 We hereby certify that the machinery stipulated below complies with all relevant provi...

Page 24: ...rves the right to make amendments to this manual without prior notice and declines all responsibility for any errors personal injury or damage to property Length CE Rated Specification Height 340mm 500mm 800mm Available in Half Width Sizes 2 5 Metres Power Requirements 240V 10 Amp MCB 50Hz Weight Capacity Maximum 12 Tonnes on Standard Kerbs Finish Galvanised MMA Flexgrip Paint Top Plate Operation ...

Reviews: