
INSTALLATION
28
Parker Automation Controller Installation Guide
Removing the Controller
To remove the PAC Controller from the DIN rail:
1.
Push the module up and against the metal spring located on the underside of the rail guide.
2.
Tip the module away from the rail as shown in the illustration.
3.
Pull the module down and out of the mounting rail.
Adding PACIO Modules
WARNING: Always attach or remove PACIO Modules with the system in a powered-
down state. Damage to the modules or unintended I/O functionality
might occur.
Earth Ground
Just as with the PAC Controller, connect the PACIO Modules to Earth by attaching the metal housing to
operative Earth via the grounded DIN rail.
Summary of Contents for PAC
Page 11: ...CHAPTER 1 Product Overview...
Page 18: ......
Page 19: ...CHAPTER 2 Installation...
Page 33: ...CHAPTER 3 System Start up and Configuration...
Page 69: ...CHAPTER 4 PACIO Modules...
Page 143: ...2 After adding the device and code to the project you will configure the IO map as displayed...
Page 155: ...PAC with 400XR series...
Page 156: ...PACIO MODULES 156 Parker Automation Controller Installation Guide...
Page 157: ...PAC with 400LXR...
Page 158: ...PACIO MODULES 158 Parker Automation Controller Installation Guide PAC with SMH sensors...
Page 159: ...CHAPTER 5 Communication Interfaces Optional...
Page 176: ......
Page 177: ...CHAPTER 6 Troubleshooting...
Page 188: ...TROUBLESHOOTING 188 Parker Automation Controller Installation Guide...
Page 189: ...APPENDIX A PAC System Specifications...
Page 195: ...APPENDIX B Additional Information...