- 81
–
18-06-08 PVD3668_GB_GVM_June_2018
4.4. Maintenance Operations
Generality
DANGER: The installation, commissioning and maintenance operations
must be performed by qualified personnel, in conjunction with this
documentation.
The qualified personnel must know the safety local regulations.
They must be authorized to install, commissioning and operate in
accordance with established practices and standards.
Please contact PARKER for technical assistance.
Operation
Periodicity
Section
number
Cooling water quality inspection
Every year
§3.6
Check all tightening torques on all
screws in the terminals box
Every year
§4.2
Check the bearings
Every year
§3.5
Clean the motor
Every year
Inspect and lubricate shaft seals
Every year
§4.2.3
Inspect and lubricate shaft splines
Every year
Inspect coolant fittings, and hoses
Every year
§3.6
Inspect power and feedback cables
Every year
§4.3
Summary of Contents for GVM Series
Page 2: ...2 18 06 08 PVD3668_GB_GVM_June_2018...
Page 16: ...16 18 06 08 PVD3668_GB_GVM_June_2018 Consult us for more demanding applications...
Page 33: ...33 18 06 08 PVD3668_GB_GVM_June_2018 GVM210 150 in Generator operation mode...
Page 39: ...39 18 06 08 PVD3668_GB_GVM_June_2018 3 3 Dimension drawings 3 3 1 GVM142 outline drawings...
Page 40: ...40 18 06 08 PVD3668_GB_GVM_June_2018...
Page 41: ...41 18 06 08 PVD3668_GB_GVM_June_2018...
Page 42: ...42 18 06 08 PVD3668_GB_GVM_June_2018 3 3 2 GVM210 outline drawings...
Page 43: ...43 18 06 08 PVD3668_GB_GVM_June_2018...
Page 44: ...44 18 06 08 PVD3668_GB_GVM_June_2018...
Page 45: ...45 18 06 08 PVD3668_GB_GVM_June_2018...
Page 46: ...46 18 06 08 PVD3668_GB_GVM_June_2018...
Page 47: ...47 18 06 08 PVD3668_GB_GVM_June_2018...
Page 53: ...53 18 06 08 PVD3668_GB_GVM_June_2018...
Page 55: ...55 18 06 08 PVD3668_GB_GVM_June_2018...
Page 60: ...60 18 06 08 PVD3668_GB_GVM_June_2018 With Oil with a 46 cSt viscosity 40 C input at 65 C...