background image

 

 

 
 

 

 

 

Operations Manual 

 

 

 

 

 

PDT-NSU-7105-MP-SF-I 

 

Revision 1.0 

 March 2023 

 

Summary of Contents for PDT-NSU-7105-MP-SF-I

Page 1: ...Operations Manual PDT NSU 7105 MP SF I Revision 1 0 March 2023...

Page 2: ...6 Connectors and Indicators 6 6 1 LED Indicators 6 6 2 Fuse Holder 6 6 3 RJ45 Ports 7 6 4 Power Connections 7 6 5 PoE Output 7 6 6 PoE Budget 7 7 Installation Procedures 8 7 1 DIN Rail Installation 8...

Page 3: ...1 Revision History Date Rev By Comments Checked Date 14 03 2023 01 JF Initial Release SC 14 03 2023...

Page 4: ...ption AP Access Point CCA Copper Clad Aluminium DC Direct Current IEEE Institute of Electrical and Electronic Engineers IP Internet Protocol MTBF Mean Time Between Failures PD Power Device PoE Power o...

Page 5: ...arty To prevent possible danger damage and bodily harm when handling the equipment please observe all warnings cautions notices contained in this section Failure to heed the following danger warnings...

Page 6: ...0 BASE T Port and 1 x 100 1000 BASE X auto detecting SFP Port to allow connectivity using 1 or 2 core Single or Multi Mode fiber The unit is designed for harsh industrial conditions and environments a...

Page 7: ...No Connection OFF PoE Established L A Link Activity Yellow OFF Not Running Flashing Running SPD Port Speed Yellow OFF No Connection ON 1000Mbps SFP SFP Module Green OFF Not Detected ON Connected FUSE...

Page 8: ...es using 1 or 2 core fiber in Single or Multi Mode fiber configuration 6 4 Power Connections Model V V Power Input PDT NSU 71045 MP SF I GND 12 48VDC Note All Power Supplies should provide over curren...

Page 9: ...e switch to the required surface using appropriate fixings 7 Installation Procedures 7 1 DIN Rail Installation 7 2 Wall Mount Installation Attach the DIN Rail Bracket if not fitted to the switch case...

Page 10: ...ports TP1 4 are available for other devices or connections All cables should be solid copper and not CCA 8 3 SFP Port Connections Ensure that the SFP socket is clear from any dirt or contamination an...

Page 11: ...9 Physical Dimensions...

Page 12: ...Uplink Fiber 1 x 1000 BASE FX SFP PoE Standard IEEE 802 3af IEEE 802 3at Port Type RJ45 Power Pin Assignment 4 5 7 8 Power Budget Max Combined 100W ENVIRONMENTAL Operating Temperature 40 C to 80 C St...

Page 13: ...tic Discharge EN 61000 4 2 2009 Electromagnetic Field Immunity EN 61000 4 3 2010 Electrical Fast Transients EN 61000 4 4 2012 Surge EN 61000 4 5 2014 A1 2017 Conducted Immunity EN 61000 4 6 2014 Power...

Reviews: