Management Control
2-2
9124-A2-GH30-00
June 1999 - Preliminary
Customer End User Management Overview
The optimal method for managing an end-user network is shown in the example
below. Using this method saves PVC charges because management data is
multiplexed with customer data using a single PVC.
By accessing the remote units in-band, the remote units are not
router-dependent, so trouble isolation is easier when there are LAN outages.
Frame
Relay
Router
FrameSaver
9124
Unit
98-15870
Frame
Relay
Network
Frame
Relay
Router
FrameSaver
9124
Unit
Customer
NMS
Frame
Relay
Router
FrameSaver
9124
Unit
Central
Site
Customer
Branch 1
Customer
Branch 2
PVCs Containing
Multiplexed Management
EDLCIs and
Customer Data
Physical Connection
PVC Connection (Using EDLCIs)
PVC Connection (Using Standard DLCIs)
Standard Local PVC
For details configuring in-band management links to the central and remote site
FrameSaver units, see
Configuring Management PVCs
in Chapter 8,
Configuration Options.
Summary of Contents for FrameSaver SLV 9124
Page 200: ...Configuration 8 78 9124 A2 GH30 00 June 1999 Preliminary This page intentionally left blank ...
Page 286: ...Menu Hierarchy A 4 9124 A2 GH30 00 June 1999 Preliminary This page intentionally left blank ...
Page 346: ...Index IN 12 9124 A2 GH30 00 June 1999 This page intentionally left blank ...