Connecting Fire Circuits and PGMs
Alarm Relay and PGM Connections
AC Power & Backup Battery Connections
Transformer Requirements Table
Transformer:
16VAC
20VA*
(Amseco XP-1620)
16.5VAC
40VA
(Universal UB1640W)
*not verified by UL
DC Power
Supply rated at:
MG5000/MG5050 = 1.0A
SP5500/SP6000/SP7000 = 1.4A
Auxiliary Supply can
provide a maximum of:
typ: 600mA
max: 700mA
UL installations: typ. 200mA
Acceptable Battery Charge
Currents (section [127]
option [5])
350mA/700mA
For 4-wire installation:
Program the Activation
Event so that the smoke
detectors can be reset by
pressing the
[
CLEAR
] +
[
ENTER
]
keys for three
seconds. See Event Group
# 6 on page 18. For 2-wire
installation (except
SP5500): Press
[
CLEAR
]
+
[
ENTER
]
to automatically
reset smoke.
All 4-wire smoke
detectors must be
connected using the
daisy chain
configuration.
Each control panel
(except the SP5500)
supports a maximum of
five 2-wire smoke
detectors.
Partial view of control panel
UL Warning:
A 12Vdc / 7Ah battery is required to comply with UL fire
requirements.
Caution:
Disconnect battery before replacing the fuse.
Rechargeable Battery
UL/ULC - 12Vdc / 4Ah or 7Ah
Improper
connection
of the
transformer
may result in
damage to the
system.
Summary of Contents for SP5500
Page 51: ...Magellan Spectra SP 51 Hardware Connections Single Zone Inputs...
Page 52: ...52 Programming Guide Advanced Technology Zone ATZ Connections...
Page 56: ...56 Programming Guide SP5500 8x10 SP6000 11x11 SP7000 11x11...
Page 63: ......
Page 64: ...paradox com Printed in Canada 07 2007 MGSP EP11...