background image

1

2

I N ST R U CT I O N 

M A N U A LS

Chainsawbars

Unit 2  Brookside Farm  Agars Lane  Silver Street  Hampshire  SO41 0FL  UK  England
T. +44 (0)1590 681 259  You can also text or WhatsApp us on M. +44 (0)7508 276 769
www.chainsawbars.co.uk

Summary of Contents for 42"

Page 1: ... U CT I O N M A N U A LS Chainsawbars Unit 2 Brookside Farm Agars Lane Silver Street Hampshire SO41 0FL UK England T 44 0 1590 681 259 You can also text or WhatsApp us on M 44 0 7508 276 769 www chainsawbars co uk ...

Page 2: ... BRACKETS FRAME 16 STAGE 3 CONTROL HANDLE 17 STAGE 4 CONTROL TUBE 18 STAGE 5 UPRIGHTS 19 STAGE 6 ASSEMBLY OF ALL SECTIONS 20 21 Panther Chainsaw Mills have been designed by professional chainsaw users over years of development The mills are precision engineered highly versatile user friendly and have unique features that do not exist on any other portable chainsaw mill in the world Panther Chainsa...

Page 3: ...Profile Side Rail 2 19 CM002C 30 x 30mm Profile Cross Brace 2 ITEM NUMBER PART NUMBER DESCRIPTION AMOUNT IMAGE 20 CM003 Rack Mount BKT 2 21 CM004A Pinion Block 2 22 CM005 Rack Clamp 2 23 CM006A Control Tube 1 24 CM011 Bar Clamp Washer 2 25 CM035 MK2 Saw Guide 2 26 CM019 Stop Boss 1 27 CM025 End Bar Guard 1 28 CM029 Plastic Insert 2 29 CM031 Pinion 2 30 CM009A Corner Bracket 8 31 CM009B Eyebolt M8 ...

Page 4: ...ner Brackets into the Cross Brace end ensuring to insert the longer ends of the Corner Bracket Use the other Cross Brace as a guide sliding the Corner Brackets into the top and tightening the upright Grub Screws Insert the Slide Nuts as shown opposite Screw in the Hex Screw Flanged M8 These can be hand tightened ready for the Push Handle later You should end up with all Corner brackets secured as ...

Page 5: ...2 nuts for the Push Handle and slide them onto the Profile Side Rails on the right Then take the Tool Holder Cross Rail and slide it on the left Push Handle Cross Rail Tool Holder Cross Rail 2F Insert 2 Slide Nuts M8 into the right hand side near the Push Handle side place the Rack Mount on top and then screw in a Hex Screws M8 with a Plain Washers M8 Slide Nut M8 Please ensure the Cross Braces ar...

Page 6: ...the Grub Screws ensuring they are facing the same direction as the Grub Screws in Task 4B 4A 4B 4D 4E 4C 42 STAGE 5 UPRIGHTS Take the following parts Item 4 x 2 Nyloc Nuts M8 Flange Item 6 x 2 Plain Nuts M8 Item 10 x 2 Spring Washers M8 Item 12 x 2 Square Chrome Plastic Inserts Item 13 x 2 Grub Screw M8 x 50mm Cup Points Item 15 x 2 Magnets Flat Retaining Item 16 x 1 Right Rack Assembly Item 24 x ...

Page 7: ...aller guide bars Engine Upright Right Rack Assembly Loosen Handle Loosen Handle Insert Upright Insert Upright Loosen both Adjustable Handles and insert the Nose End Upright on the left and the Engine Upright on the right You may need to loosen the bolts next to the Adjustable Handles to slide the Uprights in Loosen the Adjustable Handles and set both Uprights to a height of 2 then tighten the Adju...

Page 8: ... 1 27 CM025 End Bar Guard 1 ITEM NUMBER PART NUMBER DESCRIPTION AMOUNT IMAGE 28 CM029 Plastic Insert 2 29 CM031 Pinion 2 31 CM009B Eyebolt M8 Optional item 2 32 CM009C Handle Grip 4 33 CM009D Hand Winch 600lb Optional Accessory 1 37 465334 Round Chrome Plastic Insert 3 38 CM012W Winch Eye Spacer CM027 Optional item On larger mill these are used to space winch away from the frame 2 39 CM 02L Left R...

Page 9: ...g to insert the longer ends of the Corner Bracket Use the other Cross Brace as a guide sliding the Corner Brackets into the top and tightening the upright Grub Screws You should end up with all Corner brackets secured as shown 1A 1F 1C 1E 1D 1B You should end up with the Magnets secured as shown This section is for the Tool Holder 1J Take the parts opposite Insert the Hex Screws through the Magnet...

Page 10: ...e the Cross Rail with the 2 nuts for the Push Handle and slide them onto the Profile Side Rails on the right Then insert 2 Slide Nuts M6 into the middle Cross Rail before sliding it into the middle Then take the Tool Holder Cross Rail and slide it on the left Make sure both ends are square Please ensure the Cross Braces are square with no gaps where they are joined to the Profile Side Rails and th...

Page 11: ...rews in Task 4B 4A 4B 4D 4E 4C Add the Pinion Block Extended the larger Pinion Block after the first Handle Grip 60 STAGE 5 UPRIGHTS Take the following parts Item 4 x 2 Nyloc Nuts M8 Flange Item 6 x 2 Plain Nuts M8 Item 10 x 2 Spring Washers M8 Item 12 x 2 Square Chrome Plastic Inserts Item 15 x 2 Magnets Flat Retaining Item 16 x 2 Rack Assemblies Item 24 x 1 Bar Clamp Washer Item 25 x 2 MK2 Saw G...

Page 12: ...en the grub screws to ensure that the Pinions line up Then fit the Control Handle to the Side Rail using the 2 x Hex Screws Flanged M8 6E 6G 6H Set height to 2 Tighten the 2 x Hex Screws M8 on the Nose End Upright on the left hand side ensuring that everything is square Set this Upright to 2 to match the engine end 6F Align teeth to centre Align teeth to centre Face Handle away from edge Check tha...

Page 13: ... U CT I O N M A N U A LS Chainsawbars Unit 2 Brookside Farm Agars Lane Silver Street Hampshire SO41 0FL UK England T 44 0 1590 681 259 You can also text or WhatsApp us on M 44 0 7508 276 769 www chainsawbars co uk ...

Reviews: