Polar Bear III HD 5 Degree Installation Manual
9910034 Rev F
24
To DC
Grounding Path
Ground Lug
Tyco #2106831-1
Racking Ground Connection Detail
Racking Ground
To Adjacent
Ballast Tray
To Adjacent
Ballast Tray
Module Ground
Module Ground
Module Ground
Typical: East-West Module to Racking to Module Bonding Path
Ground Path
through Support
Typical: North-South Module to Module
Bonding Path
Connect ballast trays to modules
using a single continuous solid
copper wire per row. See
instructions for copper sizing
Ballast trays on south row do not
need to be bonded together since
they are bonded to the northern
trays thru the Tray-Support-Claw-
Support-Tray bonding path.
Figure 16 Bonding and Grounding Instructions
Module Ground Connection Detail