
For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2010
PN426G
Page 1 of 2
DPOE24U1XG
DPoE 1Gig Power Patch Panel
Part Number: DPOE24U1XG
Remove 1" (25.4mm) of cable jacket.
Caution:
Do not damage
conductors.
Fan out all four twisted pairs in the specified wiring
sequence provided in the following section.
2.
Grounding Strap
Using a screw from the metric thread screw set denoted by
“01881-39,” attach the green and yellow striped grounding strap to
the panel via the hole nearest the power connector. Next, install the
panel onto a grounded rack using the appropriate screw set
provided which ensures proper grounding between the panel and
the rack. Finally, attach the loose end of the grounding strap to the
rack within the same position as the panel.
3.
- 48V_A
- 48V_B
RTN_B
23
24
21
22
T568A
T568A
Power Connector
1.
1"
(25.4 mm)
Record the MAC address on the Panduit DPoE Installation Worksheet (Panduit part no. PN377*). Install the wiring label on the back of
the panel over the rows of connector blocks. Be sure to install the label with the proper wiring color code facing out and ensure that the
power scheme on the label is in line with the power connector on the panel.
* Denotes revision letter.
MAC Address
Label