INSTRUCTIONS CM429A
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 4
Install Switch Ducting
Position Switch Ducting so that the perforated door of ducting faces the cold aisle and the mounting holes of Switch Ducting align with
cage nuts in equipment rails
(installed on page 2)
. Secure Switch Ducting to equipment rails using (1) #12-24 Phillips screw and (1) hex
head grounding screw
(green; use 5/16” socket wrench)
per rail. Ensure that hex head grounding screws fasten into grounding cage nuts.
(2) #12-24 Hex Head
Grounding Screws
(use 5/16” socket wrench)
Switch Ducting
Perforated Door of Switch Ducting
(faces Cold Aisle)
Install Switch Support Bracket
Position Switch Support Bracket so that the mounting holes of Switch Support Bracket align with cage nuts in equipment rails
(installed on
page 2)
. Secure Switch Support Bracket to equipment rails using (1) #12-24 Phillips screw and (1) hex head grounding screw
(green; use
5/16” socket wrench)
per rail. Ensure that hex head grounding screws fasten into grounding cage nuts.
Grounding Cage Nuts
(green)
Cage Nuts
(installed)
(2) #12-24 Phillips Screws
(2) #12-24 Hex Head
Grounding Screws
(use 5/16” socket wrench)
(2) #12-24 Phillips Screws
Cage Nuts
(installed)
Grounding Cage Nuts
(green)
Switch Support
Bracket
FRONT OF
CABINET
REAR OF
CABINET
FRONT OF
CABINET