
99
15.6 Expansion Vessel Pre Pressure Checking
For Space Heating / Cooling
Expansion Vessel with 10 L air capacity and initial pressure of 1 bar is installed in this Tank Unit.
Total amount of water in system should be below 200 L. (Inner volume of Tank Unit’s piping is about 5L)
If total amount of water is over 200 L, please add another expansion vessel. (field supply)
Please keep the installation height difference of system water circuit within 10 m.
15.7 How to Unlock Cool Mode
1.
Press buttons SET and SERVICE for 5 seconds.
2.
Press SELECT button.
3.
Unlock COOL mode with
▲
/
▼
.
4.
Press SET button.
15.8 Dry Concrete [SERVICE MODE: 03]
If Dry Concrete has been set, Dry Concrete status can be activated and monitored by following procedure.
1 Press SERVICE button for 5 seconds.
2 Press
▲
to enter menu Sr: 03 and press SET button to activate Dry Concrete function.
3 Press OFF/ON button to quit setting.
15.9 EEPROM Factory Default Data Setup Procedure
1 This process should be done at Gemstar (and/or) PAPAMY as the last process after any inspection.
2 This condition should be activated by pressing combination of few SW's for certain time as shown.
These 3 SW's should press continuously for 5secs.
(Operation should be OFF during this period)
3 When this condition is activated, default data should be written in EEPROM.
4 Once the default data is written in the EEPROM, the following full LCD display should be ON for 2secs for
confirmation. After 2secs, it goes back to normal display.
Summary of Contents for WH-ADC0916G9E8
Page 34: ...34 4 2 Outdoor Unit Air inlet rear Air inlet side Air inlet side Air outlet Air outlet ...
Page 40: ...40 8 Wiring Connection Diagram 8 1 Indoor Unit RY HT L1 RY HT L2 RY V3 RY V2 RY HT L3 ...
Page 100: ...100 Note Default value refer Location of Control and Component OPERATION ACTUAL ...