Connecting with external device (optional)
11.1.4.2
1 All connections shall follow to the local national wiring standard.
2 It is strongly recommended to use manufacturer-recommended parts and accessories for installation.
3 Two-way Valve shall be spring and electronic type, refer to “Field Supply Accessories” table for details. Valve
cable shall be (3 x min 0.5 mm
2
), of type designation 60245 IEC 57 or heavier, or similarly double insulation
sheathed cable.
o
* note: - Two-way Valve shall be CE marking compliance component.
- Maximum load for the valve is 9.8VA.
4 Room Thermostat cable must be (4 or 3 x min 0.5 mm
2
), double insulation layer of PVC-sheathed or rubber-
sheathed cable.
5 External Controller shall be connected to 1-pole switch with min 3.0mm contact gap. (connection refer to
Diagram 4.1). Its cable must be (2 x min 0.5 mm
2
), double insulation layer of PVC-sheathed or rubber-
sheathed cable.
o
* note: - When making such connection, kindly remove the jumper between terminal no. 4 and 5.
- Switch used shall be CE compliance component.
- Maximum operating current shall be less than 3A
rms
.
Wire Stripping and Connecting Requirement
11.1.4.3
Connecting
Requirement
11.1.4.4
For Tank Unit with UX09*E8* / UX12*E8* / UX16*E8* / UD09*E8* / UD12*E8* / UD16*E8*
The equipment’s power supply 1 complies with IEC/EN 61000-3-2.
The equipment’s power supply 1 complies with IEC/EN 61000-3-3 and can be connected to current supply
network.
The equipment’s power supply 2 complies with IEC/EN 61000-3-2.
The equipment’s power supply 2 complies with IEC/EN 61000-3-3 and can be connected to current supply
network.
11.1.5 Charging and Discharging the Water
Make sure all the piping installations are properly done before carry out below steps.
Charge the Water
11.1.5.1
For Domestic Hot Water Tank
1 Set the Domestic Hot Water Tank Discharge Valve to “CLOSE”.
2 Set all Tap / Shower “OPEN”.
3 Start filling water to the Domestic Hot Water Tank via Tube Connector
i
.
After 20~40min, water should flow out from Tap / Shower. Else, please contact your local authorized dealer.
4 Check and make sure no water leaking at the tube connecting points.
Terminals
Lead wire cord
1 2 3 4 5
External
Controller
Cable
Two-way
Valve Cable
6 7 8 9
Room Thermostat
Cable
HE
AT
COO
L
N
L
N
OP
EN
CL
OSE
4
5
Diagram 4.1: External Controller connecting diagram
External Controller
Terminal
Switch (ON/OFF)
Remove this
jumper if External
Controller (Optional)
is connected to the
Tank Unit
Wire stripping
5mm or
more
(gap between
wires)
No loose strand
when insert
Indoor/outdoor
connecting
terminal board
10
±
1mm
ACCEPT
PROHIBITED
Conductor
over insert
Conductor not
fully insert
Conductor
fully insert
PROHIBITED
SO
”
N
E
P
O
“
”
E
S
O
L
C
“
Domestic Hot Water Tank Discharge Valve
g
Summary of Contents for WH-ADC0916G9E8
Page 34: ...34 4 2 Outdoor Unit Air inlet rear Air inlet side Air inlet side Air outlet Air outlet ...
Page 40: ...40 8 Wiring Connection Diagram 8 1 Indoor Unit RY HT L1 RY HT L2 RY V3 RY V2 RY HT L3 ...
Page 100: ...100 Note Default value refer Location of Control and Component OPERATION ACTUAL ...