file:///E|/TH-50PHW6BX_TH-50PHW6EX_TH-50PHD6EX_TH-50PHD6BX_TH-50PHD6UY/SVC/s0201010000.html
2.1.1 Leakage Current Cold Check
1. Unplug the AC cord and connect a jumper between the two prongs on the plug.
2. Measure the resistance value, with an ohmmeter, between the jumpered AC plug and each
exposed metallic cabinet part on the equipment such as screwheads, connectors, control shafts,
etc. When the exposed metallic part has a return path to thechassis, the reading should be
between 1MΩ and 5.2MΩ.
When the exposed metal does not have a return path to the chassis, the reading must be
.
Figure 1
file:///E|/TH-50PHW6BX_TH-50PHW6EX_TH-50PHD6EX_TH-50PHD6BX_TH-50PHD6UY/SVC/s0201010000.html [2006-01-21 10:06:34]
Summary of Contents for TH-50PHD6BX
Page 415: ...How to access the Option menu ...
Page 419: ...1 Applicable signals 4 TH 50PHW6BX TH 50PHW6EX TH 50PHD6EX TH 50PHD6BX TH 50PHD6UY ...
Page 424: ...6 Service Hint 9 TH 50PHW6BX TH 50PHW6EX TH 50PHD6EX TH 50PHD6BX TH 50PHD6UY ...
Page 425: ...7 Location of Lead Wiring 10 TH 50PHW6BX TH 50PHW6EX TH 50PHD6EX TH 50PHD6BX TH 50PHD6UY ...
Page 442: ...11 2 2 Power LED no light 27 TH 50PHW6BX TH 50PHW6EX TH 50PHD6EX TH 50PHD6BX TH 50PHD6UY ...