4-2
Before Starting Production
This section describes the work that should be performed before starting up this machine.
4-2-1
Start-up Inspection
Before starting operation, check the following points.
Are all the covers closed?
Are emergency stop buttons reset?
(x 2)
(
)
State of emergency stop
State of reset
Are there any foreign objects on conveyors or
board positioning lift?
Chips
Tools
Front side
Rear side
Emergency stop button
433C-039E
433C-040E
1E4C-AB00
Emergency stop button
1E4C-AA00
1E4C-AA00
1D4C-813E