
25
6.5.
Disassembly of Net Frame
Assembly
Step 1 :
Gently lift up the Net Frame Assembly by release the 8
bosses in order of sequence (1) to (8) as shown.
Caution : During assemby of Net Frame Assembly, ensure
it is fixed properly.
6.6.
Disassembly of Front Panel
Block
• Refer to “Disassembly of Net Frame Assembly”
Step 1 :
Remove 2 screws.
Step 2 :
Remove 2 screws.
Step 3 :
Remove 2 screws.
Step 4 :
Lift up the Front Panel Block as shown.
Step 5 :
Detach the 12P FFC at connector (CN500) on Main
P.C.B..
Step 6 :
Remove the Front Panel Block.
Summary of Contents for SC-HC05GN
Page 4: ...4 1 2 Caution for AC Cord For GS only ...
Page 8: ...8 3 Service Navigation 3 1 Service Information ...
Page 9: ...9 ...
Page 10: ...10 ...
Page 11: ...11 ...
Page 12: ...12 ...
Page 14: ...14 ...
Page 15: ...15 ...
Page 17: ...17 5 Location of Controls and Components 5 1 Main Unit Remote Control Key Button Operations ...
Page 19: ...19 5 3 Using Bluetooth ...
Page 23: ...23 6 2 Types of Screws 6 3 Main Parts Location Diagram ...
Page 57: ...57 8 Block Diagram 8 1 Control Signal Diagram ...
Page 58: ...58 8 2 Voltage Current Ground Diagram ...
Page 66: ...66 ...