54
Step 4 Remove the Front Panel Block Assembly.
12.7. Disassembly of Operation But-
ton P.C.B.
• Refer to “Disassembly of Top Cabinet”.
• Refer to "Replacement of Tray Ornament".
• Refer to "Disassembly of Front Panel Block Assembly".
Step 1 Remove 2 screws.
Step 2 Release 3P Cable from ribs of Front Panel.
Caution: During assembling, dressed the 3P Cable in the
ribs of Front Panel Block Assembly.
Step 3 Lift up Operation Button P.C.B..
Caution: During assembling, ensure that Operation Button
P.C.B. is properly located and fully seated onto the Front
Panel.
Summary of Contents for SA-XH170EB
Page 5: ...5 1 4 Caution For AC Cord For EB only ...
Page 6: ...6 1 5 Caution For Fuse Replacement ...
Page 15: ...15 4 1 Others Licences ...
Page 16: ...16 5 General Introduction 5 1 Power Saving Features ...
Page 17: ...17 5 2 Linked Operations with the TV VIERA Link HDAVI Control ...
Page 18: ...18 5 3 Disc Information 5 3 1 Discs that can be played ...
Page 19: ...19 5 3 2 File Extension Type Support MP3 JPEG DivX 5 4 DivX Information ...
Page 20: ...20 6 Location of Controls and Components 6 1 Remote Control Key Button Operations ...
Page 21: ...21 6 2 Main Unit Key Button Operations ...
Page 23: ...23 7 3 Connection with an ARC compatible TV ...
Page 25: ...25 3 Gently pull out the tray 4 Remove disc ...
Page 26: ...26 8 2 Playing From an USB Device ...
Page 49: ...49 12 3 Main Components and P C B Locations ...
Page 77: ...77 Step 9 Slide the tray in fully ...
Page 82: ...82 ...
Page 92: ...92 ...
Page 118: ...118 ...
Page 130: ...130 ...
Page 134: ...134 ...