Step 14
Install the tray base, traverse ass’y, mechanism cover
and upper plate.
[Operation check after servicing]
Check the proper operation of following items with gear and
hexagonal screwdriver.
1. Open/close of tray base.
2. Moving the tray base to the stock side.
3. UP/DOWN operation of spindle base unit.
4. UP/DOWN operation of traverse ass’y.
10.7.4. Replacement for the motor ass’y
Step 1
Install the belt temporarily.
NOTE:
Take care not apply the grease to the belt.
Step 2
Upset the CD loading unit.
Step 3
Remove 3 screws.
Step 4
Unsolder the plunger terminals (2 points).
Step 5
Unsolder the motor terminals (2 points).
Step 6
Release the 2 claws (A), and then remove the Motor
P.C.B.
Step 7
Release the claw (B), and then remove the motor ass’y.
[Notice for motor ass’y installation]
1. Locate the name plate of motor to the traverse ass’y.
2. Align the hole of motor with the ribs.
30
SA-AK220E / SA-AK220EB
Summary of Contents for SA-AK220E
Page 4: ...1 Caution for AC Mains Lead 4 SA AK220E SA AK220EB ...
Page 10: ...9 Operation Procedures 10 SA AK220E SA AK220EB ...
Page 83: ...22 Troubleshooting Guide 83 SA AK220E SA AK220EB ...
Page 85: ...23 1 Deck Mechanism RAA4502 S 23 1 1 Deck Mechanism Parts Location 85 SA AK220E SA AK220EB ...
Page 86: ...86 SA AK220E SA AK220EB ...
Page 89: ...89 SA AK220E SA AK220EB ...
Page 91: ...23 3 Cabinet 23 3 1 Cabinet Parts Location 91 SA AK220E SA AK220EB ...
Page 92: ...92 SA AK220E SA AK220EB ...
Page 93: ...93 SA AK220E SA AK220EB ...
Page 103: ...23 6 Packaging 103 SA AK220E SA AK220EB PRT0403 D K J N L ...
Page 104: ......