background image

4

Summary of Contents for MC-CL671-RA76

Page 1: ... P C B assy removal 7 4 3 Motor removal 9 4 4 Cord reel unit replacement 10 4 5 Spring loaded cord reel pre winding 11 4 6 Installation of some Pakkin 11 4 7 How to disassemble the turbine nozzle 12 5 Wiring Connection Diagram 14 6 Exploded View and Replacement Parts List 15 6 1 EXPLODED VIEW ATTACHMENTS MC CL675 MC CL673 MC CL671 15 6 2 PARTS LIST ATTACHMENTS MC CL675 MC CL673 MC CL671 16 6 3 EXP...

Page 2: ...urce 230V 50Hz Input power MAX 2300W 2100W 2000W Input power Nominal 2000W 1800W 1700W Power control O Extension wand Telescopic Floor nozzle O O Turbin nozzle O Dimensions WxLxH mm 290x470x280 Net weight 6 4kg 6 0kg Cleaning tools Crevice nozzle Upholstery nozzle ...

Page 3: ...3 2 Location of Controls and Components ...

Page 4: ...4 ...

Page 5: ...or Suction inlet Check if there is any blockage in the hose or suction inlet If there is any blockage remove it Dust box unit Upper filter Unit Secondary filter Check whether or not the dust box unit is full of dust or dust is clogged in the upper filter unit or secondary filter If the dust box unit is full of dust then throw away the dust If dust is clogged in the upper filter unit or secondary f...

Page 6: ...sy from the main body 2 Remove the filter cover from the upper body and remove the filter unit 3 Remove the three screws fixing the upper and lower bod ies 4 Insert a flat blade screwdriver into the gap between the upper body and the ornamental plate unit Move the screwdriver in the direction of the arrow to remove the ornamental plate unit from the three hooks on the upper body Remove the ornamen...

Page 7: ...w from the bottom of the lower body to remove the lower caster support plate caster unit 7 From the bottom of the lower body remove the four screws fixing the upper and lower bodies 8 Lift the upper body to separate it from the lower body 4 2 P C B assy removal 1 Remove the control shaft and switch cover unit with spring A fitted ...

Page 8: ...packing from the lower body 4 Remove the P C B assy from the P C B holder When removing the P C B assy unhook it from the tab on the P C B holder by spreading the holder frame Note When removing the P C B assy do not bend it to prevent damage and the wires from breaking ...

Page 9: ...or disconnecting the fast on ter minal hold the P C B assy and connecting terminals 6 Disconnect the fast on terminal of the lead wire connect ing the P C B assy to the body partition assy MC CL675 MC CL673 CL671 4 3 Motor removal 1 Remove the P C B holder from the lower body 2 Remove the motor set from the lower body ...

Page 10: ...ber rear b Remove the motor support c Remove the noise absorber d Remove the motor support rubber front MC CL675 MC CL673 CL671 4 4 Cord reel unit replacement 1 Lift the body partition assy fitted with the cord reel unit while removing the cord reel shaft from the side of the lower body ...

Page 11: ...t pre winds the cord reel If the cord is not wound then press the brake lever unit and the cord pre winding will be loosened Pre wind the cord as indicated by the arrow mark Number of pre windings Four turns If you wish to release the pre winding then make sure to hold the cord plug 4 6 Installation of some Pakkin 1 Remove the two screws fixing the lower and front bodies 2 Remove the front body fr...

Page 12: ... Pull up the agitator ass y and remove the belt and agitator ass y complete Fig 26 4 7 2 Separation of the floor nozzle upper U from the floor nozzle lower U 1 Remove the four screws fixing the floor nozzle lower U Fig 27 2 Remove the floor nozzle lower U 4 7 3 Turbine Ass y 1 Pull up the floor nozzle wand U and remove the turbine ass y Fig 28 ...

Page 13: ... 4 Removal of the floor nozzle brush CU DU EU FU 1 Turn the floor nozzle lower unit over Insert the tip of a flat blade screwdriver into the ditch in the brush installa tion part then remove the brush Fig 29 ...

Reviews: