Page 3-11
CHANGING THE
PRODUCTION BOARDS
3
3-6
Board Transfer Test
After adjusting the board rail width and support pins, carry out the board transfer test and check
that the board is transferred smoothly.
NOTICE
Actually the transfer test of whole line is carried out. This section describes the
board on the rear conveyor of pre-station, after the transfer test to the pre-station.
1
. Turn on the servo switch.
2
. Press
Product
config
.
• The production setting screen appears.
3
. Press
UNLOCK
and PCB transfer .
• The board transfer screen appears.
OFF ( ) ON ( )
SERVO
To the next page
293C-E-EMA03-A01-02
3Y3C-EEn-Main-001
Summary of Contents for KXF-293C
Page 2: ......
Page 15: ...Page 15 SAFETY PRECAUTIONS Be sure to observe DANGER 293C E EMA00 A03 01 ...
Page 40: ...Page 1 14 293C E EMA01 A01 01 MEMO ...
Page 52: ...Page 2 12 293C E EMA02 A01 01 MEMO ...
Page 80: ...Page 4 16 293C E EMA04 A01 01 MEMO ...
Page 122: ...Page 6 18 293C E EMA06 A01 01 MEMO ...
Page 132: ...Page 7 10 293C E EMA07 A01 01 MEMO ...