2-1
2 Preparation
2.1 System Environment ···································································2-2
2.2 System Overview ·······································································2-3
2.2.1 System Connection Diagram ·····················································2-3
2.3 Setup on the Programmable Controller (GX Works3) Side ··················2-4
Summary of Contents for IO-Link SC-LG-CEF
Page 2: ...WUME SCLGCT 3 2 MEMO ...
Page 6: ...WUME SCLGCT 3 6 MEMO ...
Page 12: ...WUME SCLGCT 3 1 6 MEMO ...
Page 44: ...WUME SCLGCT 3 4 8 MEMO ...