Panasonic FV-07VB1 Supplementary Installation Instructions Download Page 6

6

INSTALLATION FOR FV-07VBA1 CONTINUED

Fig.5

7 7/8 (200)

7 7

/8 (

20

0)

Ceiling

Housing can

7 7/8 (200)

7 7

/8 (

2

0

0

)

Fig.7

The clamps of the adaptor should be clipped 

on fan housing correctly.

Install the adaptor and secure v

entilation 

duct before installing junction box. 

Fig.6

10. Finish ceiling work. Ceiling hole should be

       aligned with the inside edge of the flange.

       (Fig. 5)

After finishing the ceiling job, fill gap between flange and

ceiling with caulk or other sealant to prevent air leakage.

Fig.6

Fan housing

3 Long screws

(ST4.2X20)

Key hole

Stud

3 Long screws

   (ST4.2X20)

Fan housing
Key hole

Stud

1. Affix the fan housing to stud with 3 long screws

    (ST4.2X20) by affixing first 1 screw in front of the

    stud, hang up the fan housing through the key

    hole, tighten the screw, then affix other 2 screws.

    (Fig. 6)

2. Install the ventilation duct and secure it with a clamp and seal it

    with mastic or approved foil tape. A 4 inch circular duct is needed

    to connect to the relevant part of adaptor. (Fig 2 of page 5)

5. Affix the junction box cover to junction box with

    ST4.2X8 screw.

  9. Select the air volume speed by adjusting the switch. Factory setting is 

"I" (Standard) position;

      pressing "II" (Boost) s

the high airflow position. 

elects 

(Fig.4 of page 5 )

10. Finish wall work. Wall hole should be aligned with the inside edge of the flange. (Fig.7)

Before affixing screw    (ST4.2X8), make sure the tongue of the junction box is clipped on 

fan housing correctly. (Fig.3 of page 5)

Mount junction box cover carefully so that lead wires are not pinched.

7. Finish the wall work. Ceiling hole should be aligned with 

    the inside edge of the flange. (Fig. 7)

3. Remove Junction box cover and secure conduit

    or strainto junction box cover knock-out hole

    (      or     ). (Fig. 3 of page 5)

B

A

6. Select the air volume speed by adjusting the switch.

     Factory setting is “I” (Standard) position; preseting

     “II” (Boost) selects the high airflow position. 

     (Fig. 3 of page 5)

INSTALLATION FOR FV-07VBA1A CONTINUED

INSTALLATION FOR FV-07VBA1(WALL MOUNTING)

7. Finish the wall work. Ceiling hole should be aligned with 

    the inside edge of the flange. (Fig. 5)

After finishing the wall job, fill gap between

flange and  wall with caulk or other sealant

to prevent air leakage.

Housing can

Wall

3. Remove screws ST4.2X8 from Junction box cover

    and secure conduit or strain to knock-out hole

    (      or     ). (Fig. 3 of page 5)

4. Refer to wiring diagram.

     Follow all the local electrical safety codes as well as the

     National Electrical Code (NEC). Using UL approved 

     wire nuts, connect house power wires to ventilating 

     fan wires.

Mount junction box cover carefully so

that the lead wires are not pinched.

7. Finish the wall work. Ceiling hole should be aligned with 

    the inside edge of the flange. (Fig. 5)

Reviews: