/DVD-S35xx/s0601030000.html
стол
Рабочий
file:///C|/Documents and Settings/eDOK/
6.1.3 Handling of optical pickup
1. To keep the good quality of the optical pickup maintenance parts during transportation and before
installation, the both ends of the laser diode are short-circuited. After replacing the parts with
new ones, remove the short circuit accordingtothe correct procedure. (See this Technical Guide.)
2. Do not use a tester to check the laser diode for the optical pickup. Failure to do so will damage
the laser diode due to the power supply in the tester.
/DVD-S35xx/s0601030000.html03.10.2007 22:44:44
стол
Рабочий
file:///C|/Documents and Settings/eDOK/
Summary of Contents for DVD-S35EE
Page 20: ......
Page 129: ...DVD S35GCS GCU GC GCA GD PL PX POWER SUPPLY SCHEMATIC DIAGRAM ...
Page 131: ...DVD S35EE GN POWER SUPPLY SCHEMATIC DIAGRAM ...
Page 133: ...DVD S35PLA POWER SUPPLY SCHEMATIC DIAGRAM ...
Page 147: ...DVD S35GCS GCU GC GCA GD EE GN PL PLA PX MOTOR SCHEMATIC DIAGRAM ...
Page 149: ...DVD S35GCS GCU GC GCA GD EE GN PL PLA PX OPERATION SCHEMATIC DIAGRAM ...
Page 168: ...DVD S35GCS GCU GC GCA GD EE GN PL PLA PX MOTOR P C B REP3501A C 1 A B C D 2 3 4 5 MOTOR P C B ...
Page 213: ...16 3 POWER SUPPLY SCHEMATIC DIAGRAM DVD S35PLA DVD S35PLA POWER SUPPLY SCHEMATIC DIAGRAM 49 ...
Page 214: ...16 3 POWER SUPPLY SCHEMATIC DIAGRAM DVD S35PLA DVD S35PLA POWER SUPPLY SCHEMATIC DIAGRAM 49 ...