MECH-39
2-6. Main Brake Torque
Confirmation
TEST
S Reel, T Reel
MODE
EJECT (Power OFF)
TOOL
Torque Gauge (VFK71A, VFK1191A)
Torque Gauge Adapter (VFK1152)
Direction A
Refer to item “7. Table of connector”
Direction B
SPEC
Refer to item “7. Table of connector”
Click this button , then go to item “7. Table of
Connector”.
1. Install the adapter (VFK1152) to the torque
gauge (VFK71A).
2. Put the torque gauge on S Reel and turn the
torque gauge to direction A until S Reel slips
against brake.
3.
Confirm the torque is within the specification.
4. Put the torque gauge on T Reel and turn the
torque gauge to direction A until T Reel slips
against brake.
5.
Confirm the torque is within the specification.
6. Install the adapter (VFK1152) to the torque
gauge (VFK1191A).
7. Put the torque gauge on S Reel and turn the
torque gauge to direction B until S Reel slips
against brake.
8.
Confirm the torque is within the specification.
9. Put the torque gauge on T Reel and turn the
torque gauge to direction B until T Reel slips
against brake.
10. Confirm the torque is within the specification.
Figure 2-6
2-7. Supply & Take-up Brake Arm
Unit Replacement
(Studio VTR only)
(Removal)
1.
Press the iron core of Brake Solenoid to release
the Brake.
2. Remove the cut washers (A) and remove the
supply and Take Up Brake Arm Unit as shown in
Figure 2-7.
(Installation)
1. Install the new Supply and Take-up Brake Arm
Unit follow the previous steps in reverse order.
NOTE: Hang on the Brake Arm Spring as shown in
Figure 2-7.
2.
Perform the Main Brake Torque confirmation.
Figure. 2-7
Summary of Contents for AJSDX900P - 24P DVCPRO 50
Page 3: ... 3 ...
Page 4: ... 4 AJ SDX900E ...
Page 5: ... 5 ...
Page 7: ... 7 AJ SDX900P ...
Page 8: ... 8 AJ SDX900E ...
Page 9: ...FCD0307NTNK96E440E441 ...
Page 279: ...CBA 1 MOTHER P C BOARD VEP89140A FOIL SIDE FOIL SIDE REF LOC P6 C6 P11 A6 P13 A6 ...
Page 310: ...CBA 32 MENU SW P C BOARD VEP80C58A FOIL SIDE COMPONENT SIDE ...
Page 312: ...PRE REC P C BOARD VEP83608A AJ YA903G FOIL SIDE COMPONENT SIDE CBA 34 ...