MECH-60
(Adjustment)
1. Place the reels in the L size position.
2. Push the iron core of M-Stopper Solenoid by
hand.
3. Observe the clearance (A) between Mech.
Chassis and M-Stopper as shown in Figure 5-27-2.
And make sure that it is within 1.1 to 1.3mm.
4. If not, loosen the 2 screws (A), which fixed
M-Stopper Solenoid. And adjust the position of
M-Stopper Solenoid so that the clearance (A) is
within the specification. And tighten the 2 screws
(A).
Figure 5-27-2
6-1. Mech. I/F P.C. Board
5-28. T4 Post Position Adjustment
1. Confirm that the hole (B) of T4 connection Gear
match with the hole of T4 post as shown in figure
5-28-1.
2. Confirm that the portion (C) of T4 connection Gear
and hole (A). Those are located as shown in figure
5-28-1.
3. If not, adjust the phase of T4 post.
Note:
This confirmation should be performed on
unloading condition.
Figure 5-28-1
Figure 6-1-1
P15
P25 P26
P12
P16
P36
P11 P48
P21
6. CONNECTOR LOCATION
Summary of Contents for AJSD955B - DVCPRO50 STUDIO DECK
Page 3: ...3...
Page 4: ...4 AJ YA931G AJ YA932G AJ YAC930G...
Page 6: ...6 AJ SD930P AJ SD955AP...
Page 7: ...7 AJ YA931G AJ YA932G AJ YAC930G...
Page 8: ...FCD0211NTIK83K84...
Page 65: ...INF 56 14 ERROR MESSAGES...
Page 66: ...INF 57...
Page 67: ...INF 58...
Page 72: ...INF 63 16 CIRCUIT BOARD LAYOUT DRAWING...
Page 105: ...MECH 26 Figure 3 32 3 Figure 3 32 4 Adjust within specification Confirm this value...
Page 109: ...MECH 30 Figure 3 34 3 Figure 3 34 4 Adjust within specification Confirm this value...
Page 111: ...MECH 32 Figure 3 35 2 Confirm this value...