
MECH-41
5-2. Cleaning Arm Unit
Replacement
(Removal)
1. Unscrew the 2 screws (A) and remove the T1
Guide as shown in Figure 5-2-1.
2. Widen the tip of the cleaner arm, lift up the
cleaning arm unit and remove the spring and
washer.
(Installation)
1. Install the spring and washer.
2. Insert Cleaning Arm Unit temporary to T2 Arm Unit.
Install the spring between Cleaner Base Plate and
Cleaning Arm Unit, and insert Cleaner Arm Unit to
T2 Arm Unit perfectly.
3. Confirm that the Cleaner Roller rotate when rotate
the cylinder by hand pressing the core of the
Cleaner Solenoid.
4. Install the T1 Guide.
5. After install the T1 Guide, please perform the item
“5-3. T1 Guide Position Adjustment”.
Figure 5-2-1
5-3. T1 Guide Position Adjustment
1. Place the unit to loading condition without the
tape.
2. Observe the clearance (B) between T1 Guide and
T1 post as shown in Figure 5-3-1, and make sure
that it is within 0.2mm to 0.5mm.
3. If not, loosen the 2 screws (A) and adjust the
position of the T1 Guide moves to direction of
arrow (G
←→
G) so that the clearance (B) is within
the specification. And tighten the 2 screws (A).
Figure 5-3-1
B
Summary of Contents for AJSD955B - DVCPRO50 STUDIO DECK
Page 3: ...3...
Page 4: ...4 AJ YA931G AJ YA932G AJ YAC930G...
Page 6: ...6 AJ SD930P AJ SD955AP...
Page 7: ...7 AJ YA931G AJ YA932G AJ YAC930G...
Page 8: ...FCD0211NTIK83K84...
Page 65: ...INF 56 14 ERROR MESSAGES...
Page 66: ...INF 57...
Page 67: ...INF 58...
Page 72: ...INF 63 16 CIRCUIT BOARD LAYOUT DRAWING...
Page 105: ...MECH 26 Figure 3 32 3 Figure 3 32 4 Adjust within specification Confirm this value...
Page 109: ...MECH 30 Figure 3 34 3 Figure 3 34 4 Adjust within specification Confirm this value...
Page 111: ...MECH 32 Figure 3 35 2 Confirm this value...