
BWT™ System Installation Guide
39
Chapter 4. Non-Flanged Installation (FSPA/FWPA Buffers)
4.5 Verifying the Installation
To verify that the installation is working properly, complete the following steps:
1.
Power up the electronics.
2.
Refer to
Displaying Diagnostics in the flowmeter Service or User’s Manual to display the upstream and
downstream transducer signal strength.
3.
Record this data in the
Service Record in the appendix provided for this purpose in the flowmeter Service or User’s
Manual.
4.
Verify that the signal strength diagnostics readings are the same or better after 8 hours of operation.
This completes the installation of the FSPA/FWPA buffers and transducers. Refer to the flowmeter
Startup Guide or
User’s Manual for instructions on obtaining flow rate measurements.
Summary of Contents for BWT System
Page 1: ...panametrics com Flow 916 058 F July 2021 BWT System Installation Guide ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 8: ...Contents BWT System Installation Guide ...
Page 52: ...Chapter 5 Specifications 44 BWT System Installation Guide no content intended for this page ...
Page 54: ...46 BWT System Installation Guide no content intended for this page ...
Page 57: ......