
Chapter 4. Non-Flanged Installation (FSPA/FWPA Buffers)
36
BWT™ System Installation Guide
4.2 Installing the FSPA or FWPA Buffer
Both types of buffers are easily installed into the pipe coupling or flange as follows:
•
FSPA Threaded Mount:
Use Teflon
tape thread sealant on the buffer threads and screw the buffer into the
transducer port. Hand-tightening the NPT threads will seal the connection without torquing.
•
FWPA Socket-Weld Mount:
Insert the buffer into the meter body transducer port and weld it to the port in
accordance with all applicable safety codes and procedures.
WARNING!
Welding should be performed by qualified personnel only. Safety personnel should be
consulted.
Summary of Contents for BWT System
Page 1: ...panametrics com Flow 916 058 F July 2021 BWT System Installation Guide ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 8: ...Contents BWT System Installation Guide ...
Page 52: ...Chapter 5 Specifications 44 BWT System Installation Guide no content intended for this page ...
Page 54: ...46 BWT System Installation Guide no content intended for this page ...
Page 57: ......