CHAPTER 1
4
General
The present installation guideline is an instruction and technical demand for companies that carry out
crane installations and it applies to PALFINGER MARINE PSM-cranes for the
Taiko Trading Co. Ltd.
Project
.
PALFINGER cannot be held liable for the consequences/influence of deviations from this instruction.
Installing company
The installing company is responsible to observe the following issues:
•
Nationally applicable law and regulations.
•
Regulations of the customer, owner or the shipyard.
•
Operational and traffic safety.
•
Classification in the correct lift group.
•
Responsible to complete the crane documentation (crane book)
In case of any deviations or special assembly the crane must be re-classified (modification of the
loads).
In case the crane classification changes it is required to contact PALFINGER MARINE.
Crane installer
The crane installer is additionally responsible for:
•
Compliance with and proper installation according to the assembly instructions.
•
Stability reserve in the entire working range.
•
Possibility to carry out maintenance on the crane at the place of installation.
•
Stability of the crane during installation (e.g., support it by another crane if it has not
been fastened and secured yet)
•
Observance of safety regulations and provisions.
•
Observance of corrosion protection according to PALFINGER regulations and provisions
Danger!
Improper use leads to premature wearing and overloading
of components.
Summary of Contents for PSM400-16
Page 15: ...CHAPTER 4 12 CHAPTER 4 Crane handling In this chapter Crane handling 13 Storage 16...
Page 37: ...CHAPTER 8 34 CHAPTER 8 Power Pack In this chapter Filling the power pack tank 34...
Page 44: ...CHAPTER 10 41 CHAPTER 10 Post assembly check In this chapter Post assembly check 42...
Page 47: ...CHAPTER 11 Commissioning In this chapter Commissioning 44 Term Definitions 44...
Page 49: ...CRANES LIFESAVING EQUIPMENT WINCHES AND HANDLING EQUIPMENT SERVICE 2021 11 15 Revision 3 0 NOV...