105
Folding In the Link Bridge
Press the pushbutton
(46)
on the hand cable control 2 and
hold it in this position. Briefly after this press and hold the
pushbutton
(45)
on the same hand cable control. Hold both
pushbuttons in this position until the link bridge has reached
the required position.
Putting Down the Safety Railings
Open the fastener of the first safety railing and swivel down
the railing until it lies on the platform.
Repeat this procedure for the second safety railing.
Closing the Platform
Press the pushbutton
(43)
on the hand cable control 1 and
hold it in this position. Briefly after this press and hold the
pushbutton
(42)
on the same hand cable control. Hold both
pushbuttons in this position until the platform is completely
closed.
Betriebsanleitung_Hubladebuehnen_EN.book Seite 105 Donnerstag, 15. August 2019 4:04 16
Summary of Contents for MBB C 1000 S
Page 3: ...Betriebsanleitung_Hubladebuehnen_EN book Seite 3 Donnerstag 15 August 2019 4 04 16...
Page 41: ...41 Betriebsanleitung_Hubladebuehnen_EN book Seite 41 Donnerstag 15 August 2019 4 04 16...
Page 63: ...63 Betriebsanleitung_Hubladebuehnen_EN book Seite 63 Donnerstag 15 August 2019 4 04 16...
Page 77: ...77 Betriebsanleitung_Hubladebuehnen_EN book Seite 77 Donnerstag 15 August 2019 4 04 16...
Page 81: ...81 Betriebsanleitung_Hubladebuehnen_EN book Seite 81 Donnerstag 15 August 2019 4 04 16...
Page 85: ...85 Betriebsanleitung_Hubladebuehnen_EN book Seite 85 Donnerstag 15 August 2019 4 04 16...
Page 89: ...89 Betriebsanleitung_Hubladebuehnen_EN book Seite 89 Donnerstag 15 August 2019 4 04 16...