Installing PG-Flex System Hardware
52
Install the Channel Units
The following procedures are the same for POTS, LS/GS, and ISDN channel units. Refer to Table 4
on page 21 through Table 8 on page 24 for line unit and system compatibility.
Install channel unit and verify operation as follows (see Figure 24 “Card Locations for a 19" COT
Shelf” or Figure 25 “Card Locations for a 23" COT Shelf”):
1
Insert the channel unit into the COT shelf and verify that all LEDs:
•
turn on for about two seconds,
•
then scan from top to bottom,
•
then turn Off.
If the LEDs do not follow the above sequence, refer to the troubleshooting section.
2
Provision the channel unit as described in the provisioning section
3
Place a cross-connect (jumper) from the CO to the appropriate COT shelf termination for the
circuit(s) selected.
An FPI-729 List 1 PGTC Interface Unit or an FAU-728 List 2 Alarm Unit must be installed at all
times when ISDN channel units are installed. These units provide the composite clock reference
source for the ISDN channel units and is required for normal operation of the ISDN channel
units. Removing the FPI-729 List 1 or FAU-728 List 2 during an ISDN will terminate the call.
Observe normal electrostatic discharge precautions when handling electronic equipment. Do not
hold electronic plugs by their edge. Do not touch components or circuitry.
Summary of Contents for PG-Flex
Page 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Page 24: ...PG Flex System Overview 16 ...
Page 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Page 62: ...Installing PG Flex System Hardware 54 ...
Page 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Page 104: ...Performance Monitoring 96 ...
Page 120: ...Troubleshooting 112 ...
Page 158: ...Screen Menus and Definitions A 36 ...
Page 162: ...Acronyms and Glossary Glossary 4 ...
Page 167: ......
Page 168: ......