PAA VARIO LONG Owner'S Manual Download Page 1

OWNERS MANUAL 

Congratulations on the purchase of your bathtub! 

 

VARIO LONG 
 

Please read and follow all the instructions contained in this Owners Manual before installing your bath-
tub. In addition, you should refer to these instructions during the life of your bathtub. 

 

 

Instruction for bathtub installation 

Only a qualified serviceman should perform the installation of your bathtub. 

 
Preparation of area 
The place under the tub must be in the same level as the floor. 
All drain connections should fit in between bathtub and its legs (see the drawing).  
The centre of drain is pointed in the drawing. Before assembling connections check the inlet of drainage (Ø 50 mm); 
it must be either in one level or maximum 50 mm from the floor and not closer within a radius of 200 mm from the 
centre of bathtubs drain outlet (see the drawing). 

In case the tub must be installed in the niche, provide the length of the niche 5 mm bigger then bathtub’s 
length. Otherwise tub could become deformed and as the result of this there could be cracks.  
Fill the gap between tub and wall with silicone.  

 
The installation of bathtub 
When place for tub is prepared, water and drainage assembled, bathtub is ready for installation.  
Adjust the height of the tub using unit feet (drawing a). Assure the tub is based on all feet; avoid swinging of the 
unit. 

Upon receipt, immediately inspect the bathtub to make sure the unit has shipped as ordered and 
has arrived undamaged.

 

If a problem is discovered, call your PAA dealer immediately.   

Handling damages are not covered under warranty.

 

pic.  a 

Reviews: