Cube С-01 turnstile
4
1. General instructions
1.1. During operation of the turnstile in order to maintain efficiency and to
ensure calculated lifetime the maintenance operation of the turnstile shall
be carried out periodically, including the warranty period (hereinafter
MO).
1.2. MO shall be performed once in 6 months. Should there be any failure
MO should be performed immediately after repair works.
1.3. During MO it is recommended to carry out the work by two qualified
mechanical and electrical engineers, acquainted with the manual.
1.4. MO includes the following scope of work: partial disassemble of the
turnstile, cleaning of load-bearing frame, checking of parts and units
fixation, lubrication of subject to wear parts of actuating device, checking
of belt tension, setting the dismantled parts and a general inspection of the
turnstile.
Summary of Contents for Cube C-01
Page 1: ...Maintenance operations www oxgard com info oxgard com Tel 7 812 366 15 94 Cube 01 turnstile...
Page 2: ......
Page 7: ...Maintenance operations 7 Fig 2 Move up...
Page 9: ...Maintenance operations 9 Fig 4...
Page 10: ...Cube 01 turnstile 10 Fig 5...
Page 12: ...Cube 01 turnstile 12 Fig 6...
Page 13: ...Maintenance operations 13 Fig 7...
Page 15: ...Maintenance operations 15...