1. General instructions

 

 

1.1. During operation of the turnstile in order to maintain efficiency and to 

ensure calculated lifetime the maintenance operation of the turnstile shall 

be carried out periodically, including the warranty period (hereinafter 

MO). 

1.2. MO shall be performed once in 6 months. Should there be any failure 

MO should be performed immediately after repair works. 

1.3. During MO it is recommended to carry out the work by two qualified 

mechanical and electrical engineers, acquainted with the manual. 

1.4. MO includes the following scope of work: partial  disassemble of the 

turnstile,  cleaning  of  load-bearing  frame,  checking  of  parts  and  units 

fixation, lubrication of subject to wear parts of actuating device, checking 

of belt tension, setting the dismantled parts and a general inspection of the 

turnstile. 

Summary of Contents for Cube C-01

Page 1: ...Maintenance operations www oxgard com info oxgard com Tel 7 812 366 15 94 Cube 01 turnstile...

Page 2: ......

Page 3: ...ctions 4 2 Conditions for performance of technical maintenance 5 3 Partial disassembly of the turnstile 5 4 Checking turnstile assemblies 11 5 Lubricating sliding parts of turnstile mechanisms 11 6 As...

Page 4: ...uld there be any failure MO should be performed immediately after repair works 1 3 During MO it is recommended to carry out the work by two qualified mechanical and electrical engineers acquainted wit...

Page 5: ...trongly forbidden to unfasten a cross board located under the indication panel Otherwise the manufacturer will terminate the validity of warranty for the product ATTENTION It is not recommended to adj...

Page 6: ...wo screws 1 and four screws 2 smoothly move the backshell up at a small distance so that not to break the cable coming to the indication board Fig 2 Disconnect the cable from the indication board Move...

Page 7: ...Maintenance operations 7 Fig 2 Move up...

Page 8: ...rther work to achieve this retract fixation lock 2 of the crossbars Fig 3 and while holding one crossbar in a fixed position rotate the other crossbar by the other hand clockwise so that all the cross...

Page 9: ...Maintenance operations 9 Fig 4...

Page 10: ...Cube 01 turnstile 10 Fig 5...

Page 11: ...urnstile mechanisms it is required to 1 Remove lower decorative board having undone two screws 1 Fig 6 2 Remove arms unit to get this 2 1 Unscrew fixation lock 2 with box spanner D22 2 2 Loose a screw...

Page 12: ...Cube 01 turnstile 12 Fig 6...

Page 13: ...Maintenance operations 13 Fig 7...

Page 14: ...r s manual and is available on the web site www oxgard com 6 2 In case of repair of damaged painted surfaces one should use powder paint identical to the damaged RAL9005 guiding the instructions for i...

Page 15: ...Maintenance operations 15...

Page 16: ...OOO Vozrozhdenie 66 Sofiyskaya str 192289 Saint Petersburg tel fax 7 812 336 15 94 www oxgard com info oxgard com...

Reviews: